Experiences in Implementing Risk-Based Inspection

نویسندگان

  • Chris Ablitt
  • J Speck
چکیده

Some of the 'early adopters' of risk-based inspection (RBI) failed to cross the RBI technology chasm because as pioneers, they were essentially experimenting with the suitability of this new technology, Figure.1. The followers ('early and late majority') can benefit from the experiences (failures and successes) of these trailblazers. RBI has received considerable attention since the American Society of Mechanical Engineers (ASME) [1] and the American Petroleum Institute (API) [2] began publishing guidelines on risk-based inspection and maintenance planning methods in the late 1980's. The Bahrain Petroleum Company (BAPCO) was one of the first operators in Bahrain to implement RBI. Since RBI planning continues to generate considerable interest in the Middle East, some of the practicalities of applying RBI are also presented in this paper. These experiences arose during a pilot study with TWI, conducted on process plant, storage tanks, boilers and pipelines at BAPCO in 2003. As part of a major joint industry project [3], TWI carried out a questionnaire-based industrial survey in 2001, to gain a better understanding of the reality of RBI usage and the needs of operators. Approximately 90 of the questionnaires that were distributed worldwide, were returned to TWI. Some of the more interesting findings, are reported in this paper for the benefit of operators new to RBI.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Economic-Statistical Design of a Control Chart for High Yield Processes When the Inspection is Imperfect

CCC-r control chart is a monitoring technique for high yield processes. It is based on the analysis of the number of inspected items until observing a specific number of defective items.  One of the assumptions in implementing CCC-r chart that has a significant effect on the design of the control chart is that the inspection is perfect. However, in reality, due to the multiple reasons, the...

متن کامل

کاربرد رویکرد بازرسی بر مبنای ریسک در انتخاب سیاست‌های نگهداری و تعمیرات (نت)

This paper describes Risk Based Inspection (RBI) methodology which is constructed in one of the units of Tehran Oil Refinery, (ISOMAX unit). The result of RBI Execution is a risk matrix which is constructed with Probability of Failure and Consequence of Failure. To define risk, probability of failure and consequence of failure and active damage mechanism were recognized. Riskwise software was a...

متن کامل

Risk Based Inspection (RBI) Best Practice: The Technical Specification for Ensuring Successful Implementation

This Keynote Paper is written to help plant sites wishing to implement Risk Based Inspection (RBI) for the first time to enhance their equipment integrity management practice as well as for those plant sites not satisfied with their existing Risk Based Inspection (RBI) process at site and considering a change. It is also considered of immense value for plant sites wishing to set up a Risk Based...

متن کامل

Examining Educational Leaders Experience of Implementing Teacher-Oriented Educational Monitoring Patterns in Elementary Schools

The purpose of this study was to investigate educational leaders' experience in implementing teacher-centered educational monitoring models in elementary schools. This research was carried out in a qualitative way and based on the foundational data theory approach. Potential research participants consisted of educational leaders of West Azarbaijan Province who were selected by targeted sampling...

متن کامل

Examining Educational Leaders Experience of Implementing Teacher-Oriented Educational Monitoring Patterns in Elementary Schools

The purpose of this study was to investigate educational leaders' experience in implementing teacher-centered educational monitoring models in elementary schools. This research was carried out in a qualitative way and based on the foundational data theory approach. Potential research participants consisted of educational leaders of West Azarbaijan Province who were selected by targeted sampling...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006