Fuzzy Gain Scheduling for Load Frequency Control of Single Area Multi Source Hydro-Thermal-

نویسنده

  • S. Balamurugan
چکیده

Power system is a combination of a number of sources and loads properly linked by a transmission system. The source is a generating system fueled by renewable or non renewable system where bio mass fuel is used to generate electric power. Due to low levels of bio fuel availability, the gas turbine system is considered as a weak system when compared to thermal and hydro systems. However, stable operation can strong sources. The mathematical modelling of a gas turbine system was proposed by Rowen (1983). Later many authors have proposed several modelsfor gas turbine plant,Hamid Asgari Hannet et al (1995); Hannet and Khan (1993), but Rowen’s model is a proven model for the analysis of gas turbine plants to enhance its performance. With Rowen’s model as reference, a small signal model of gas turbine plant is developed for interconnected operation with thermal and hydro systems. The one line diagram of the Single Area Multi Source system is shown in Fig.1. A control strategy is formulated to control the frequency deviation in the single area system with s The modelling of thermal (Elgerd, 2000) and hydro systems (IEEE committee report, 1973) involve speed governors and turbine systems. These speed governors are identified with drooping c limitation of speed governor drooping characteristics of thermal and hydro systems, the frequency would settle with steady state error when the systems are subjected to load change. , 10(5) Special 2016, Pages: 137-143

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Variable Structure Fuzzy Gain Schedule Based Load Frequency Control of Non-Linear Multi Source Multi Area Hydro Thermal System

The article focuses on the issues of Load Frequency Control (LFC) under non-linear strategies in multi source multi area hydro thermal system. On practical perspective dead band, boiler dynamics, reheat steam turbine along with hydro turbine operating under two different area capacities are considered in the system. When subjected to random load variations in both the areas, the system exhibits...

متن کامل

A Robust Discrete FuzzyP+FuzzyI+FuzzyD Load Frequency Controller for Multi-Source Power System in Restructuring Environment

In this paper a fuzzy logic (FL) based load frequency controller (LFC) called discrete FuzzyP+FuzzyI+FuzzyD (FP+FI+FD) is proposed to ensure the stability of a multi-source power system in restructured environment. The whale optimization algorithm (WOA) is used for optimum designing the proposed control strategy to reduce fuzzy system effort and achieve the best performance of LFC task. Further...

متن کامل

Load frequency stabilization of four area hydro thermal system using Superconducting Magnetic Energy Storage system

Automatic generation control in electric power system design is a major concern nowadays due to its rising size, varying structure, integration of renewable-energy sources and distributed generators to meet the growing demand. In this paper, automatic generation control of an interconnected four area hydro thermal system examined. Each area equipped with reheat turbine for thermal system and hy...

متن کامل

Performance Evaluation of Hybrid Intelligent Controllers in Load Frequency Control of Multi Area Interconnected Power Systems

This paper deals with the application of artificial neural network (ANN) and fuzzy based Adaptive Neuro Fuzzy Inference System(ANFIS) approach to Load Frequency Control (LFC) of multi unequal area hydro-thermal interconnected power system. The proposed ANFIS controller combines the advantages of fuzzy controller as well as quick response and adaptability nature of ANN. Area-1 and area-2 consist...

متن کامل

Load frequency control of interconnected hydro-thermal power system using conventional pi and fuzzy logic controller

In industry or any area increasing load is a vast problem for power generation plants due to increase in demand for power. So making balance between generation and demand is the operating principle of load frequency control (LFC). The reliable operation of a large interconnected power system necessarily requires an Automatic Generation Control (AGC). The objective of AGC is to regulate the powe...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016