Ranking Construction Project Alternatives with the Analytic Network Process Method
نویسنده
چکیده
In evaluating construction investments, public or private sector owners often have several project alternatives, e.g. different sites for development and different types of building. Assessing each of them so as to identify the best for implementation is owners’ most important decision in the project planning stage. The traditional net present worth method has difficulty in including intangible benefits and risks, so the result of it may not represent the overall value of an alternative. The multi-attribute utility theory method can include all factors in producing a total utility score for an alternative, but it has difficulty in determining criteria weights and utility functions. The analytic hierarchy process method can derive criteria weights and priority scores of alternatives from paired comparisons, but it cannot incorporate feedback relations between criteria and alternatives as it is done hierarchically in a top-down manner. This paper proposes an improved model for assessing project alternatives using the analytic network process method as the generalized analytic hierarchy process method to include the feedback impacts absent from the analytic hierarchy process. To illustrate the model, three recent housing projects in Kaohsiung, Taiwan were used as hypothetical alternatives being considered by a medium developer. A study of related factors that influenced their economics as well as feedback relations between factors and alternatives were conducted to determine the criteria and the dependency links in the network model. Based on company and project conditions, values of inputs for the model were set and were processed to produce the criteria weights and the relative scores of the alternatives for establishing their priority ordering. The ANP model results in changes in the ranking of the sites from those produced by the AHP method due to the additional relations.
منابع مشابه
Identification and ranking risks of horizontal directional drilling for oil & gas wells by using fuzzy analytic network process, a case study for Gachsaran oil field wells
Risk ranking of Horizontal Directional Drilling (HDD) for gas and oil wells is a key criterion in the project feasibility, pricing and for introducing a risk management strategy that aims to reduce the number of failures in the installation phase and its negative consequences. HDD is currently widely used in drilling wells in Iran, but research in the area of identification and risks ranking of...
متن کاملEvaluation of Alternative Construction Sites with Analytic Network Process Method
In evaluating housing projects, developers often have several sites as alternatives for development. Assessing each site so as to identify the best for implementation is their most important decision in the project planning stage. The traditional net present worth method has difficulty in including intangible benefits and risks, so the result of it may not represent the overall value of an alte...
متن کاملSolving Critical Path Problem in Project Network by a New Enhanced Multi-objective Optimization of Simple Ratio Analysis Approach with Interval Type-2 Fuzzy Sets
Decision making is an important issue in business and project management that assists finding the optimal alternative from a number of feasible alternatives. Decision making requires adequate consideration of uncertainty in projects. In this paper, in order to address uncertainty of project environments, interval type-2 fuzzy sets (IT2FSs) are used. In other words, the rating of each alternativ...
متن کاملUsing Hybrid Fuzzy PROMETHEE II and Fuzzy Binary Goal Programming for Risk Ranking: A Case Study of Highway Construction Projects
Multi attribute decision making methods are considered as one of the most useful methods for solving ranking problems. In some decision making problems, while the alternatives for corresponding criteria are compared in a pairwise comparison manner, if the criteria are inherently fuzzy, debates will arise in ranking alternatives due to the closeness of the values of the criteria. In this researc...
متن کاملPower plant project risk assessment using a fuzzy-ANP and fuzzy-TOPSIS method
Economic growth in developing countries has resulted in increasing demand for infrastructure projects like power plants. To meet these development needs, the government of Iran has engaged companies to carry out power plant projects. While many papers have been written on the subject of project risk management, little information exists on the actual use of risk management in practice. The prim...
متن کامل