Strategic decision-making in NPD projects according to risk: Application to satellites design projects

نویسندگان

  • François Marmier
  • Ioana Filipas Deniaud
  • Didier Gourc
چکیده

In this paper we present a method for making strategic decisions in New Product Development (NPD) projects based on risks. In NPD the complexity of the process depends both on the nature of the design problem and the difficulties associated with managing the project (activities, risks). To design a complex product several different teams, having different competencies, work on the project. Not one among them controls the entire process. The interactions between product subsystems in NPD often lead to technological arbitration between alternative solutions In selecting one solution over another, the risk management concerns and the overall project plan are affected. Therefore, the objective is to give the project manager the means to evaluate the effects of strategic decisions, including those that influence the selection of technological solutions for the project plan as well as those for risk treatment strategies. We propose an integrated process that comprises design, project management and risk management. It takes into consideration the design activities and risk activities to generate a design project planning where design activities and risk activities are folded into the overall design project plan. During the process of project design two different types of strategies are required: one relates to the problem design, the other to the assessment of project risks. Each strategy leads to different possible scenarios. We present a decision tree that shows the decision steps and possible project scenarios. A generic decision support system is proposed. We demonstrate its applicability by applying it to a satellite design project.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Strategic Evaluation of Sustainable Projects based on Hybrid Group Decision Analysis with Incomplete Information

– Sustainable evaluation of construction projects in strategy-focused condition is the main issue for municipalities to appropriately improve public sector services. In this respect, the group decision-making methods could help experts to select suitable sustainable projects and to schedule them regarding their ranking results. Therefore, the objective of this study is to present a hybrid group...

متن کامل

A Fuzzy Decision-Making Methodology for Risk Response Planning in Large-Scale Projects

Risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. The conventional approaches tend to be less effective in dealing with the impreciseness of risk response p...

متن کامل

Project Risk Assessment Framework

This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...

متن کامل

Project Risk Assessment Framework

This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...

متن کامل

A Multi-Criteria Decision-Making Approach with Interval Numbers for Evaluating Project Risk Responses

The risk response development is one of the main phases in the project risk management that has major impacts on a large-scale project’s success. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. Conventional approaches tend to be less effective in dealing with the imprecise of the risk response deve...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers in Industry

دوره 65  شماره 

صفحات  -

تاریخ انتشار 2014