An effective shuffled frog-leaping algorithm for lot-streaming flow shop scheduling problem
نویسندگان
چکیده
This paper presents an effective shuffled frogleaping algorithm (SFLA) for solving a lot-streaming flow shop scheduling problem with equal-size sublots, where a criterion is to minimize maximum completion time (i.e., makespan) under both an idling and no-idling production cases. Unlike the original SFLA, the proposed SFLA represents an individual or frog as a job permutation and utilizes a position-based crossover operator to generate new candidate solutions. An efficient initialization scheme based on the Nawaz–Enscore–Ham heuristic is proposed to construct an initial population with a certain level of quality and diversity. A simple but effective local search approach is embedded in SFLA to enhance the local intensification capability. In addition, a speed-up method to evaluate insert neighborhood is presented to improve the algorithm’s efficiency. Extensive computational experiments and comparisons are provided, which demonstrate the effectiveness of the proposed SFLA against the best performing algorithms from the literature.
منابع مشابه
Genetic and Improved Shuffled Frog Leaping Algorithms for a 2-Stage Model of a Hub Covering Location Network
Hub covering location problem, Network design, Single machine scheduling, Genetic algorithm, Shuffled frog leaping algorithm Hub location problems (HLP) are synthetic optimization problems that appears in telecommunication and transportation networks where nodes send and receive commodities (i.e., data transmissions, passengers transportation, express packages, postal deliveries, etc....
متن کاملCombined Heat and Power Economic Dispatch using Improved Shuffled Frog Leaping Algorithm
Recently, Combined Heat and Power (CHP) systems have been utilized increasingly in power systems. With the addition penetration of CHP-based co-generation of electricity and heat, the determination of economic dispatch of power and heat becomes a more complex and challenging issue. The optimal operation of CHP-based systems is inherently a nonlinear and non-convex optimization problem with a lo...
متن کاملCustomer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop
This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...
متن کاملShuffled Frog-Leaping Programming for Solving Regression Problems
There are various automatic programming models inspired by evolutionary computation techniques. Due to the importance of devising an automatic mechanism to explore the complicated search space of mathematical problems where numerical methods fails, evolutionary computations are widely studied and applied to solve real world problems. One of the famous algorithm in optimization problem is shuffl...
متن کاملModelling and Scheduling Lot Streaming Flexible Flow Lines
Although lot streaming scheduling is an active research field, lot streaming flexible flow lines problems have received far less attention than classical flow shops. This paper deals with scheduling jobs in lot streaming flexible flow line problems. The paper mathematically formulates the problem by a mixed integer linear programming model. This model solves small instances to optimality. Moreo...
متن کامل