Managing Cost Overrun Risk in Project Funding Allocation

نویسندگان

  • Chung-Li Tseng
  • Kyle Y. Lin
  • Satheesh K. Sundararajan
چکیده

This paper discusses decision making of project funding allocation under uncertain project costs. Because project costs are uncertain and funding allocations may not necessarily match the costs required, each project is inherently subject to a cost overrun risk (COR). In this paper, a model is proposed in which project cost is treated as a factor with a probability density function. The decision maker then allocates the total funding to the projects while minimizing a weighted sum of mean and variance of the COR of the project portfolio. Some properties of project COR are derived and interpreted. Optimal funding allocation, in relationship to factors such as various project sizes and riskiness, project interdependency, and the decision maker’s risk preference, is analyzed. The proposed funding allocation model can be integrated with project selection decision-making and provides a basis for more effective project control.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Qualitative analysis of Time delay and Cost overrun in Multiple Design and Build Projects

Nowadays projects are more complicated involving huge contract values, participants from multi-discipline, more specialized works, tighter schedule, stringent quality standards, etc. Ultimately, cost and time are the two key parameters that plays significant role in a project success. The study focuses on multiple Design and Build (D&B) project which has complicated risk and is governed by fixe...

متن کامل

A Model for Sharing the Costs of Uncontrollable Risks among Contracting Parties

The allocation of risks among the contracting parties in a contract is an important decision affecting the project success. Some risks in a project are uncontrollable; these are imposed to a project by external factors. Since contracting parties can neither control nor affect the occurrence of such risks, their allocation to a party would be inequitable. Therefore the cost overrun related to un...

متن کامل

System Dynamics Aproach For Quantitative Risk Allocaion

Allocation of construction risks between clients and their contractors has a significant impact on the total construction costs. This paper presents a system dynamics (SD)-based approach for quantitative risk allocation. Using the proposed SD based approach, all the factors affecting the risk allocation process are modeled. The contractor’s defensive strategies against the one-sided risk alloca...

متن کامل

MaCO: A Tool For Aiding Management Of Cost Overrun Of A Software Development Project

„Cost Overrun‟ is one of the major factors for the failure of a software development project. The major reason for this difficulty is poor analysis and management of risk factors. This paper aims to find out the ways to manage and predict the overrun in this cost by using Influence Diagram (ID). Two major risk factors having adverse impact on the cost are decided to be: (1) creeping user requir...

متن کامل

Factors Causing Project Cost Overrun in the Telecommunications Industry in Oman

Several studies have been carried out to investigate the causes of project cost overrun in different industries worldwide. This paper reports on the results of a study investigating the factors causing project cost overrun in Oman. Data required for this study were collected from 44 project engineers and managers of client and contracting companies involved in telecommunications projects. Accor...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Annals OR

دوره 135  شماره 

صفحات  -

تاریخ انتشار 2005