Replacement of Power Transformers basis on Diagnostic Results and Load Forecasting
نویسندگان
چکیده
This paper describes interconnection between technical and economical making decision. The reason of this dealing could be different: poor technical condition, change of substation (electrical network) regime, power transformer owner budget deficit and increasing of tariff on electricity. Establishing of recommended practice as well as to give general advice and guidance in economical sector, testing, diagnostic power transformers to establish its conditions, identify problems and provide potential remedies. Keywords—Diagnostic results, load forecasting, power supply system, replacement of power transformer.
منابع مشابه
کنترل ولتاژ و توان راکتیو دو مرحلهای در شبکههای توزیع در حضور سیستمهای فتوولتائیک مبتنی بر پیشبینی کوتاه مدت بار و تولید
Voltage and reactive power control have been widely employed to reduce power losses and satisfy the main distribution system operational constraints. In recent years, Distributed Generators connected to the distribution network have received increasing attention. The connection of enormous DGs into existing distribution network changes the operation of distribution systems and affect the daily ...
متن کاملShort term load forecast by using Locally Linear Embedding manifold learning and a hybrid RBF-Fuzzy network
The aim of the short term load forecasting is to forecast the electric power load for unit commitment, evaluating the reliability of the system, economic dispatch, and so on. Short term load forecasting obviously plays an important role in traditional non-cooperative power systems. Moreover, in a restructured power system a generator company (GENCO) should predict the system demand and its corr...
متن کاملA New Method for Considering Distribution Systems in Voltage Stability Studies
In methods presented to calculate the voltage collapse point, the transmission system is usually the only part of the power system that is completely modeled. Distribution systems are often replaced by aggregate load models because the use of the detailed model of distribution systems in voltage stability analysis not only increases the computation time, but also decreases the probability of co...
متن کاملLong-Term Peak Demand Forecasting by Using Radial Basis Function Neural Networks
Prediction of peak loads in Iran up to year 2011 is discussed using the Radial Basis Function Networks (RBFNs). In this study, total system load forecast reflecting the current and future trends is carried out for global grid of Iran. Predictions were done for target years 2007 to 2011 respectively. Unlike short-term load forecasting, long-term load forecasting is mainly affected by economy...
متن کاملOn-site Measurement of Load and No-load Losses of GSU Transformer
Present development and production of power transformers with lower losses in addition to replacement of outdated transformers assume regular measurement of losses in both load and no-load regime. These measurements are very demanding especially in the case of on-situ measurements. The complexity of the measurements grows with the size of transformer. This paper presents one typical test of los...