Development Effects of Electrification: Evidence from the Topographic Placement of Hydropower Plants in Brazil

نویسندگان

  • Molly Lipscomb
  • Ahmed Mushfiq Mobarak
  • Tania Barham
چکیده

We estimate the development effects of electrification across Brazil over the period 1960–2000. We simulate a time series of hypothetical electricity grids for Brazil for the period 1960–2000 that show how the grid would have evolved had infrastructure investments been made based solely on geography-based cost considerations. Using the model as an instrument, we document large positive effects of electrification on development that are underestimated when one fails to account for endogenous targeting. Broad-based improvement in labor productivity across sectors and regions rather than general equilibrium re-sorting appears to be the likely mechanism by which these development gains are realized. (JEL H54, L94, O11, O13, Q41, Q43)

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Development Effects of Electrification: Evidence from the Geologic Placement of Hydropower Plants in Brazil

Expansions of electricity grids reflect both cost considerations (where is it cheapest to generate electricity?) and demand-side concerns (where are firms and people located, and where is demand for power likely to grow most?). Demand evolves simultaneously with power generation, and complicates efforts to estimate the effects of electrification. This paper attempts to isolate the portion of th...

متن کامل

Impact of floating platforms on the limnological aspects of hydropower plant reservoirs

Floating platforms at the hydropower plant reservoirs are attractive sites for aquaculture, fishing and other recreational activities. However, the unregulated construction of these platforms may negatively affect the fauna, flora and water quality of reservoirs. Thus, this study aimed to evaluate the impact of floating platforms on the limnological aspects of Nova Ponte hydropower plant reserv...

متن کامل

A Nonlinear Model to Maximize Profit of Hydropower Plants in the Long-Run

The problem of hydropower plant profit maximization includes simultaneous programming of optimal utilization of water resources and participation in the power market. The present research was performed on a chain of hydropower plants within the Karoon river basin in Khuzestan Province (Iran) (i.e. Karoon­­ 3, Karoon 1, and Masjid Soleyman hydropower plants). In this research nonlinear programmi...

متن کامل

Electrification using Decentralized Micro Hydropower Plants in North-eastern Afghanistan

Electricity supply database from the Afghan national authority for electricity supply shows that about only 20% of the population in Afghanistan had access to grid electricity by 2010. The national utility has a total capacity of about 842 MW, out of which about 696 MW was operational. Additionally, many decentralized units (Micro Hydropower (MHP) plants, diesel generators and solar home system...

متن کامل

GIS-Based Small-Scale Hydropower Resources Assessment in Kurdistan - Iran

The industry development and the life standards increment have caused the human feels more easement, but it also has caused an increase of energy consumption, environmental pollution and the large volume of greenhouse gases emission. Those changes make the researchers to find out the alternative energy sources such as renewable energies. The most prominent and the oldest source of clean and re...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012