Case- and Constraint-Based Project Planning for Apartment Construction
نویسندگان
چکیده
ment construction project network, Hyundai Engineering and Construction and Korea Advanced Institute of Science and Technology developed a caseand constraint-based project-planning expert system for an apartment domain. The system, FASTRAK-APT, is inspired by the use of previous cases by a human expert project planner for planning a new project and the modification of these cases by the project planner using his/her knowledge of domain constraints. This large-scale, case-based, and mixed-initiative planning system, integrated with intensive constraint-based adaptation, utilizes semantic-level metaconstraints and human decisions for compensating incomplete cases imbedding specific planning knowledge. The caseand constraint-based architecture inherently supports cross-checking cases with constraints during system development and maintenance. This system has drastically reduced the time and effort required for initial project planning, improved the quality and completeness of the generated plans, and is expected to give the company the competitive advantage in contract bids for new contracts.
منابع مشابه
The resource-constraint project scheduling problem of the project subcontractors in a cooperative environment: Highway construction case study
Large-scale projects often have several activities which are performed by subcontractors with limited multi-resources. Project scheduling with limited resources is one of the most famous problems in the research operations and optimization cases. The resource-constraint project scheduling problem (RCPSP) is a NP-hard problem in which the activities of a project must be scheduled to reduce the p...
متن کاملCase and Constraint-Based Apartment Construction Project Planning System: FASTrak-APT
*Korea Advanced Institute of Science and Technology, **Hyundai Information Technology, Co., Ltd., ***Hyundai Engineering and Construction, Co., Ltd. *Dept. of MIS, 207-43, Cheongryang, Seoul 130-012, Korea. ** Technology Support Division, 140-2, Kye-dong, Chongro-ku, Seoul, Korea. ***Construction Management Dept., 140-2, Kye-dong, Chongro-ku, Seoul, Korea. *{leekj, jklee}@msd.kaist.ac.kr, **kim...
متن کاملA Cost-based Interior Design Decision Support System for Large-scale Housing Projects
In the early stages of a large-scale housing project, many interior design alternatives remain to be confirmed after a rough review of the costs. The project participants move on to the later stages of budgeting and construction without the exact information on the interior costs, and several occasions may arise when costs increase or time delays occur, driven by interior design specification c...
متن کاملWork breakdown structure (WBS) development for underground construction
a r t i c l e i n f o A work breakdown structure (WBS) can prove to be pivotal to successful project management planning. There are few published studies about the methodologies or tools to develop the appropriate WBS for a project, and those that are available are limited to the specific areas of construction such as apartment-building construction and boiler manufacturing. This research has a...
متن کاملAN EFFECTIVE METHOD FOR SIMULTANEOUSLY CONSIDERING TIME-COST TRADE-OFF AND CONSTRAINT RESOURCE SCHEDULING USING NONLINEAR INTEGER FRAMEWORK
Critical Path Method (CPM) is one of the most popular techniques used by construction practitioners for construction project scheduling since the 1950s. Despite its popularity, CPM has a major shortcoming, as it is schedule based on two impractical acceptance that the project deadline is not bounded and that resources are unlimited. The analytical competency and computing capability of CPM thus...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- AI Magazine
دوره 19 شماره
صفحات -
تاریخ انتشار 1998