A buffer minimization problem for the design of embedded systems

نویسندگان

  • Alix Munier Kordon
  • Jean-Baptiste Note
چکیده

We consider a set of n tasks, each of them is composed by a set of sequential operations. A set of bu ers B is given : each bu er b 2 B is de ned between two tasks Ti ! Tj , has a weight wb and is managed as a FIFO structure. Some operations from Ti write data in the bu er b, other from Tj get data in b. The writings and readings on bu ers generate precedence constraints between the operations. The limitation of the size of the bu ers generates an other set of precedence constraints between them and circuits in this precedence graph may appear. In this case, there is no feasible schedule for the operations. The aim is to nd the size of each bu er (b); b 2 B such that P b2B wb (b) is minimum and there is no circuit in the precedence graph. We prove that this problem is polynomial for 2 tasks using a ow algorithm. We also prove that it is NP-hard in the strong sense for 3 tasks.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Waveform Design using Second Order Cone Programming in Radar Systems

Transmit waveform design is one of the most important problems in active sensing and communication systems. This problem, due to the complexity and non-convexity, has been always the main topic of many papers for the decades. However, still an optimal solution which guarantees a global minimum for this multi-variable optimization problem is not found. In this paper, we propose an attracting met...

متن کامل

A Bi-Objective Approach to an Assembly Line Re-Balancing Problem: Model and Differential Evolution Algorithms

Assembly lines are special kinds of production systems which are of great importance in the industrial production of high quantity commodities. In many practical manufacturing systems, configuration of assembly lines is fixed and designing a new line may be incurred huge amount of costs and thereby it is not desirable for practitioners. When some changes related to market demand occur, it is wo...

متن کامل

Adaptive policy of buffer allocation and preventive maintenance actions in unreliable production lines

The buffer allocation problem is an NP-hard combinatorial optimization problem, and it is an important design problem in manufacturing systems. The research proposed in this paper concerns a product line consisting of n unreliable machines with n − 1 buffers and a preventive maintenance policy. The focus of the research is to obtain a better trade-off between the buffer level ...

متن کامل

A Linear Matrix Inequality (LMI) Approach to Robust Model Predictive Control (RMPC) Design in Nonlinear Uncertain Systems Subjected to Control Input Constraint

In this paper, a robust model predictive control (MPC) algorithm is addressed for nonlinear uncertain systems in presence of the control input constraint. For achieving this goal, firstly, the additive and polytopic uncertainties are formulated in the nonlinear uncertain systems. Then, the control policy can be demonstrated as a state feedback control law in order to minimize a given cost funct...

متن کامل

Comparison of entropy generation minimization principle and entransy theory in optimal design of thermal systems

In this study, the relationship among the concepts of entropy generation rate, entransy theory, and generalized thermal resistance to the optimal design of thermal systems is discussed. The equations of entropy and entransy rates are compared and their implications for optimization of conductive heat transfer are analyzed. The theoretical analyses show that based on entropy generation minimizat...

متن کامل

A novel mathematical model for a hybrid flow shop scheduling problem under buffer and resource limitations-A case study

Scheduling problems play a big role in manufacturing and planning the production for increasing the production efficiency and assigning the resources to operations. Furthermore, in many manufacturing systems there is a physical space between stages that called intermediate buffers. In this study, a model is proposed for minimizing the makespan of a hybrid flow shop scheduling problem with inter...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:
  • European Journal of Operational Research

دوره 164  شماره 

صفحات  -

تاریخ انتشار 2005