The segmental prestressed concrete box girder of Koror-Babeldaob (KB) Bridge in Palau, which had the record span of 241 m (791 ft.), presents a striking paradigm of serviceability loss due to excessive multi-decade deflections. The data required for analysis have recently been released and are here exploited to show how the analysis and design could be improved. Erected segmentally in 1977, this girder developed after 18 years the mid-span deflection of 1.61 m (5.3 ft.), compared with the design camber, and collapsed in 1996 in consequence of remedial prestressing, delayed by 3 months. Compared to three-dimensional analysis, the traditional beam-type analysis of box girder deflections is found to have errors up to 20% (although greater errors are likely for bridges with a higher box width-to-span ratios than the KB Bridge). However, even three-dimensional finite element analysis with step-by-step time integration cannot explain the observed deflections when the current ACI, JSCE, CEB (or CEB-FIP) and GL prediction models for creep and shrinkage are used. These models underestimate the 18-year deflection by 50% to 70% and yield an unrealistic shape of deflection history. They also predict the 18-year prestress loss to be between 22% and 29%, while the measured mean prestress loss was about 50%. Model B3, which is the only theoretically based model, underestimates the 18-year deflection by 42% and gives the prestress loss of 40% when the default parameter values are used. In model B3, however, several input parameters are adjustable and, if they are adjusted according to the long-time tests of Brooks, a close fit of all the measurements is obtained. For early deflections and their extrapolation, it is important that model B3 can capture realistically the differences in the rates of shrinkage and drying creep caused by the differences in the thickness of the walls of cross section. The differences in temperature and possible cracking of top slab also need to be taken into account. Other paradigms on which data have recently been released are four bridges in Japan and one in Czech Republic. Their deflections can also be explained. The detailed method of analysis and the lessons learned are left for part II which follows.
منابع مشابه
Excessive Long-Time Deflections of Prestressed Box Girders. I: Record-Span Bridge in Palau and Other Paradigms
The segmental prestressed concrete box girder of Koror-Babeldaob (KB) Bridge in Palau, which had a record span of 241 m (791 ft), presents a striking paradigm of serviceability loss because of excessive multidecade deflections. The data required for analysis have recently been released and are here exploited to show how the analysis and design could be improved. Erected segmentally in 1977, thi...
متن کاملEffect of Construction Method on Shear Lag in Prestressed Concrete Box Girders
Most of the previous researches conducted on shear lag of box girders were only concerned about simple types of structures, such as simply supported and cantilever beams. The structural systems concerned in these previous researches were considered as determined and unchangeable. In this paper, a finite element method considering shear lag and creep of concrete was presented to analyze the effe...
متن کاملRelaxation of Prestressing Steel at Varying Strain and Temperature: Viscoplastic Constitutive Relation
Recent studies of excessive multidecade deflections of prestressed segmentally erected box girders revealed that more accurate predictions of the prestress loss due to steel relaxation are needed for the design of large-span creep-sensitive structures. In particular, the loss needs to be calculated as part of creep structural analysis, during which the strain of concrete to which the prestressi...
متن کاملShear Strengthening Using Frp Sheets for a Idghw a Y Bridge in Manitoba, Canada
The use of heavier trucks demanded upgrading of a twenty-seven year old bridge in Winnipeg, Manitoba, Canada. Analysis of the precast prestressed concrete girders using the current AASHTO Code indicates a deficiency in the shear capacity. Shear strengthening using Carbon Fibre R_einforced Polymer (CFRP) sheets provides a low-cost solution by increasing the speed of construction and reducing tra...
متن کاملPrediction of Deflection for Prestressed Concrete Girders Using a Bayesian Approach
To control the alignment of prestressed concrete bridge during construction, it is reasonable to treat the prediction of the deflection as an uncertainty. This paper presents a Bayesian updating approach to predict the deflection of prestressed concrete girders. A prior distribution is developed by using Monte Carlo stimulation with a proposed deterministic model under a variety of prestressing...