Fuzzy Monte Carlo Simulation and Risk Assessment in Construction

نویسندگان

  • Naimeh Sadeghi
  • Aminah Robinson Fayek
  • Witold Pedrycz
چکیده

Monte Carlo simulation has been used extensively for addressing probabilistic uncertainty in range estimating for construction projects. However, subjective and linguistically expressed information results in added non-probabilistic uncertainty in construction management. Fuzzy logic has been used successfully for representing such uncertainties in construction projects. In practice, an approach that can handle both random and fuzzy uncertainties in a risk assessment model is necessary. This article discusses the deficiencies of the available methods and proposes a Fuzzy Monte Carlo Simulation (FMCS) framework for risk analysis of construction projects. In this framework, we construct a fuzzy cumulative distribution function as a novel way to represent uncertainty. To verify the feasibility of the FMCS framework and demonstrate its main features, the authors have developed a special purpose simulation template for cost range estimating. This template is employed to estimate the cost of a highway overpass project. ∗To whom correspondence should be addressed. E-mail: aminah. [email protected].

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Loss of Load Expectation Assessment in Deregulated Power Systems Using Monte Carlo Simulation and Intelligent Systems

Deregulation policy has caused some changes in the concepts of power systems reliability assessment and enhancement. In this paper, generation reliability is considered, and a method for its assessment using intelligent systems is proposed. Also, because of power market and generators’ forced outages stochastic behavior, Monte Carlo Simulation is used for reliability evaluation. Generation r...

متن کامل

Safety Risks Impacts Analysis on Construction Project Objectives Using a Hybrid Model of Fuzzy Expert System and Latin Hyper Cube Sampling

Background and aims: The construction industry has a high rate of fatal or nonfatal injuries and all around the world which remains one of the most dangerous occupations till now. Since project safety and measuring danger in the construction industry is a crucial subject, so this study aimed to measure the impacts of safety risks on the time and cost objectives of project using a hybrid method ...

متن کامل

Spatiotemporal Analysis and Health Risk Assessment of Nitrate in Kan River Basin, Tehran: Application of IRWQI and Monte Carlo Simulation

Introduction: Monitoring and controlling water resources and using health risk assessment approaches for water pollutants are essential for health promotion programs. This study aims to determine the water quality status and its spatiotemporal variation across the Kan River Basin, explore the interrelationship between surface and groundwater quality indices, and assess the nitrate health risk i...

متن کامل

Assessment of Critical Fire Risks in an Industrial Estate Using a Combination of Fuzzy Logic, Expert Elicitation, Bow-tie, and Monte Carlo Methods

Background and Objective: Industrial estates have been described as highly prone to fire incidents. According to the baseline studies, more than 85% of the industrial accidents occurring in industrial estates during the 80s and 90s were fire incidents affecting more than one factory in 10% of the cases.   Materials and Methods: After the identification of 30 high-risk industries in Abbasabad i...

متن کامل

Application of Monte Carlo Simulation in the Assessment of European Call Options

In this paper, the pricing of a European call option on the underlying asset is performed by using a Monte Carlo method, one of the powerful simulation methods, where the price development of the asset is simulated and value of the claim is computed in terms of an expected value. The proposed approach, applied in Monte Carlo simulation, is based on the Black-Scholes equation which generally def...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Comp.-Aided Civil and Infrastruct. Engineering

دوره 25  شماره 

صفحات  -

تاریخ انتشار 2010