Tight Bounds for HTN Planning with Task Insertion

نویسندگان

  • Ron Alford
  • Pascal Bercher
  • David W. Aha
چکیده

Hierarchical Task Network (HTN) planning with Task Insertion (TIHTN planning) is a formalism that hybridizes classical planning with HTN planning by allowing the insertion of operators from outside the method hierarchy. This additional capability has some practical benefits, such as allowing more flexibility for design choices of HTN models: the task hierarchy may be specified only partially, since “missing required tasks” may be inserted during planning rather than prior planning by means of the (predefined) HTN methods. While task insertion in a hierarchical planning setting has already been applied in practice, its theoretical properties have not been studied in detail, yet – only EXPSPACE membership is known so far. We lower that bound proving NEXPTIMEcompleteness and further prove tight complexity bounds along two axes: whether variables are allowed in method and action schemas, and whether methods must be totally ordered. We also introduce a new planning technique called acyclic progression, which we use to define provably efficient TIHTN planning algorithms.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Tight Bounds for HTN Planning

Although HTN planning is in general undecidable, there are many syntactically identifiable sub-classes of HTN problems that can be decided. For these sub-classes, the decision procedures provide upper complexity bounds. Lower bounds were often not investigated in more detail, however. We generalize a propositional HTN formalization to one that is based upon a function-free first-order logic and...

متن کامل

On the Decidability of HTN Planning with Task Insertion

The field of deterministic AI planning can roughly be divided into two approaches — classical statebased planning and hierarchical task network (HTN) planning. The plan existence problem of the former is known to be decidable while it has been proved undecidable for the latter. When extending HTN planning by allowing the unrestricted insertion of tasks and ordering constraints, one obtains a fo...

متن کامل

On the Feasibility of Planning Graph Style Heuristics for HTN Planning

In classical planning, the polynomial-time computability of propositional delete-free planning (planning with only positive effects and preconditions) led to the highly successful Relaxed Graphplan heuristic. We present a hierarchy of new computational complexity results for different classes of propositional delete-free HTN planning, with two main results: We prove that finding a plan for the ...

متن کامل

Bound to Plan: Exploiting Classical Heuristics via Automatic Translations of Tail-Recursive HTN Problems

Hierarchical Task Network (HTN) planning is a formalism that can express constraints which cannot easily be expressed by classical (non-hierarchical) planning approaches. It enables reasoning about procedural structures and domainspecific search control knowledge. Yet the cornucopia of modern heuristic search techniques remains largely unincorporated in current HTN planners, in part because it ...

متن کامل

From Task Definitions and Plan Traces to HTN Methods

Hierarchical Task Network (HTN) planning is an important, frequently studied research topic in artificial intelligence. Researchers have reported work on its formalisms and applications (Erol, Hendler, & Nau 1994; Smith, Nau, & Erol 1998; Nau et al. 2005). In HTN planning, complex tasks are decomposed into simpler tasks until a sequence of primitive actions is generated. HTN planning is frequen...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015