Jig Design, Assembly Line Design and Work Station Design and their Effect to Productivity

نویسندگان

  • Adi Saptari
  • Wong Soon Lai
  • Mohd. Rizal Salleh
چکیده

This report discussed the effect of workstation design, assembly design, jig design and working posture on the assembly of plugs. Two different designs of jig (vertical and rectangular) and two sets of assembly line design (one and two operators) and two set of workstations design (sitting and standing) were studied to observe their effects to productivity. Design of Experiments 2 with two levels of each factor is used to conduct an experiment for obtaining the most productive jig and assembly line design. Two groups of workers were employed to assemble the plug in 8 different ways. Number of replication is 32 for each setting and total of electric plugs produced by each group is 256 units. The results shows that jig design have the most significant effect to the assembly time. Furthermore, the other factors: assembly design and workstation design are also show significant factors to assembly time. However, interaction combinations of two or three factors were not significant to assembly time. The most productive assembly line design which achieved the lowest assembly time is the combination of one operator, with rectangular jig and work station design sitting. Meanwhile the working posture of workstation design that provides the lowest RULA score was sitting position, it provided score 2 which is safe. © 2011 Jordan Journal of Mechanical and Industrial Engineering. All rights reserved

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A cost-oriented model for multi-manned assembly line balancing problem

In many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. This type of assembly line is called multi-manned assembly line (MAL). In the classical multi-manned assembly line balancing problem (MALBP) the objective is to minimize the manpower needed to manufacture one product unit. Apart from the manpower, othe...

متن کامل

A Lean Manufacturing Roadmap for an Automotive Body Assembly Line within Axiomatic Design Framework

In this paper we are to present a practical application of Axiomatic Design (AD) methodology, as a roadmap to lean production, in redesigning a car body assembly line. Axiomatic Design theory provides a framework to simplify the whole problem. According to the AD principles, a hierarchical structure has been developed. The developed structure originated in lean manufacturing principles and exis...

متن کامل

Fuzzy multi-objective assembly line balancing problem: Fuzzy mathematical programming approach

Design of assembly line is done in order to more coordinate a collection of some consecutive work stations for the aim of obtaining more productivity from the work stations and workers. The stations are arranged in a way to have a continuous and constant material flow. In this paper a multi-objective formulation for assembly line balancing is introduced. As a solution approach a two-step approa...

متن کامل

یک روش ابتکاری برای تجزیه و تحلیل خط مونتاژ برمبنای شبیه‌سازی و طراحی آزمایش‌ها

A heuristic method based on simulation and design of experiments for performance improvement of assembly line is presented in this paper. In the proposed method, all effective factors on the performance of an assembly line are specified using the expert's point of view and then a 2k factorial design is used for the selection of the most effective factors. Also a factorial design is applied for ...

متن کامل

Study on implementation of one-piece lean line design using simulation techniques: A practical approach

This paper discusses the simulation study carried out for proposing one-piece lean line layout with features of Lean Manufacturing. The lean initiatives that can be addressed are, introducing Kanban replenishment sys-tem, better work-in-process, changing the layout, visual management techniques, standardized work for the re-duction of cycle time, number of workers, number of setups. To improve ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2011