Two - Stage Np Method with Inheritance

نویسندگان

  • Jumi Kim
  • Sigurdur Ólafsson
چکیده

The nested partitions method is a flexible and effective framework of optimizing large-scale problems with combinatorial structure. In this paper we consider the nested partitions method for simulation optimization and propose a new variant that uses inheritance to speed convergence. The new nested partitions method with inheritance algorithm performs well for when applied to test problems but it also calls for new analysis of convergence.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Interleukin-8-251 A/T and CXCR2 +1208 C/T Genes Polymorphisms in Chronic Rhinosinusitis

Introduction:  IL-8 is one of the pro-inflammatory cytokines which can play an essential role in the pathogenesis of chronic rhinosinusitis (CRS) as well as nasal polyposis (NP). The ability of individuals in producing IL-8 is partially determined by IL-8-251 A/T polymorphism. Hence, the aim of the present study was to investigate the association between IL-8-251 A/T and CXCR2 +1208 C/T genes ...

متن کامل

Appling Metaheuristic Algorithms on a Two Stage Hybrid Flowshop Scheduling Problem with Serial Batching (RESEARCH NOTE)

In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is investigated. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among th...

متن کامل

Two-stage fuzzy-stochastic programming for parallel machine scheduling problem with machine deterioration and operator learning effect

This paper deals with the determination of machine numbers and production schedules in manufacturing environments. In this line, a two-stage fuzzy stochastic programming model is discussed with fuzzy processing times where both deterioration and learning effects are evaluated simultaneously. The first stage focuses on the type and number of machines in order to minimize the total costs associat...

متن کامل

Modelling and solving the job shop scheduling Problem followed by an assembly stage considering maintenance operations and access restrictions to machines

This paper considers job shop scheduling problem followed by an assembly stage and Lot Streaming (LS). It is supposed here that a number of products have been ordered to be produced. Each product is assembled with a set of several parts. The production system includes two stages. The first stage is a job shop to produce parts. Each machine can process only one part at the same time. The second ...

متن کامل

Inheritance of the fertility restoration and genotyping of rice lines at the restoring fertility (Rf) loci using molecular markers

The combination of cytoplasmic male sterility (CMS) in one parent and a restorer gene (Rf) to restore fertility in another are indispensable for the development of hybrid varieties. To genotype rice lines at the restoring fertility (Rf) loci, 38 lines were crossed with a sterile tester (rfrf) line. Pollen fertility test was performed to identify sterile and fertile F1 hybrids. Seven lines were ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002