Analysis of Critical Paths in a Project Network with Random Fuzzy Activity Times

نویسنده

  • A. Kazemi
چکیده

93 AIJ Modeling, Identification, Simulation and Control, Vol 48, No. 2, Fall 2016 Please cite this article using: Kazemi, A., Talebi, A., and Oroojeni Mohammad-Javad, M., 2016. “Analysis of Critical Paths in a Project Network with Random Fuzzy Activity Times”. Amirkabir International Journal of Modeling, Identification, Simulation and Control, 48(2), pp. 93–101. DOI: 10.22060/miscj.2016.831 URL: http://miscj.aut.ac.ir/article_831.html *Corresponding Author, Email: [email protected] Analysis of Critical Paths in a Project Network with Random Fuzzy Activity Times

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Analysis of critical paths in a project network with random fuzzy activity times

Project planning is part of project management, which is relates to the use of schedules such as Gantt charts to plan and subsequently report progress within the project environment. Initially, the project scope is defined and the appropriate methods for completing the project are determined. In this paper a new approach for the critical path analyzing a project network with random fuzzy activi...

متن کامل

An Algorithm to Obtain Possibly Critical Paths in Imprecise Project Networks

  We consider criticality in project networks having imprecise activity duration times. It is well known that finding all possibly critical paths of an imprecise project network is an NP-hard problem. Here, based on a method for finding critical paths of crisp networks by using only the forward recursion of critical path method, for the first time an algorithm is proposed which can find all pos...

متن کامل

Fuzzy Network Analysis for Projects with High Level of Risks – Uncertainty in Time and Structure

  In order to have better insight of project characteristics, different kinds of fuzzy analysis for project networks have been recently proposed, most of which consider activities duration as the main and only source of imprecision and vagueness, but as it is usually experienced in real projects, the structure of the network is also subject to changes. In this paper we consider three types of i...

متن کامل

Solving Critical Path Problem in Project Network by a New Enhanced Multi-objective Optimization of Simple Ratio Analysis Approach with Interval Type-2 Fuzzy Sets

Decision making is an important issue in business and project management that assists finding the optimal alternative from a number of feasible alternatives. Decision making requires adequate consideration of uncertainty in projects. In this paper, in order to address uncertainty of project environments, interval type-2 fuzzy sets (IT2FSs) are used. In other words, the rating of each alternativ...

متن کامل

On the Latest Times and Float Times of Activities in a Fuzzy Project Network with LR Fuzzy Numbers

In this paper, the authors propose a new method to compute the fuzzy latest times and float times of activities for a project scheduling problem with fuzzy activity times. The authors have considered LR fuzzy numbers to represent the activity times. As the data of the problem are LR fuzzy numbers, the authors have shown that the results are also in terms of LR fuzzy numbers. Total float time of...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016