Contract for : Shared - cost RTD

ثبت نشده
چکیده

Operative commencement date of the contract: the first day of the month after the last signature of the contracting parties

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Model for Sharing the Costs of Uncontrollable Risks among Contracting Parties

The allocation of risks among the contracting parties in a contract is an important decision affecting the project success. Some risks in a project are uncontrollable; these are imposed to a project by external factors. Since contracting parties can neither control nor affect the occurrence of such risks, their allocation to a party would be inequitable. Therefore the cost overrun related to un...

متن کامل

An Experimental Study of Point Location in General Planar Arrangements

We study the performance in practice of various point-location algorithms implemented in Cgal, including a newly devised Landmarks algorithm. Among the other algorithms studied are: a näıve approach, a “walk along a line” strategy and a trapezoidal-decomposition based search structure. The current implementation addresses general arrangements of arbitrary planar curves, including arrangements o...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002