Ensemble forecasts of a floodproducing storm: comparison of the influence of modelstate perturbations and parameter modifications
نویسندگان
چکیده
High-resolution ensemble simulations (∆x = 1km) are performed with the Met Office Unified Model for the Boscastle (Cornwall, UK) flash-flooding event of 16 August 2004. Forecast uncertainties arising from imperfections in the forecast model are analysed by comparing the simulation results produced by two types of perturbation strategy. Motivated by the meteorology of the event, one type of perturbation alters relevant physics choices or parameter settings in the model’s parameterization schemes. The other type of perturbation is designed to account for representativity error in the boundary-layer parameterization. It makes direct changes to the model state and provides a lower bound against which to judge the spread produced by other uncertainties. The Boscastle has genuine skill at scales of approximately 60km and an ensemble spread which can be estimated to within ∼ 10% with only eight members. Differences between the model-state perturbation and physics modification strategies are discussed, the former being more important for triggering and the latter for subsequent cell development, including the average internal structure of convective cells. Despite such differences, the spread in rainfall evaluated at skillful scales is shown to be only weakly sensitive to the perturbation strategy. This suggests that relatively simple strategies for treating model uncertainty may be sufficient for practical, convective-scale ensemble forecasting.
منابع مشابه
A New Measure of Ensemble Performance: Perturbation versus Error Correlation Analysis (PECA)
Most existing ensemble forecast verification statistics are influenced by the quality of not only the ensemble generation scheme, but also the forecast model and the analysis scheme. In this study, a new tool called perturbation versus error correlation analysis (PECA) is introduced that lessens the influence of the initial errors that affect the quality of the analysis. PECA evaluates the ense...
متن کاملInvestigation of the effects of geomagnetic storms on ionospheric irregularities using the combination of ground-based GNSS and SWARM satellites
Geomagnetic storms are one of the main causes of ionospheric perturbations in different sizes, depending on their intensity, which could disturb radio signals passing through this medium. On September 6-12, 2017, the sudden storm commencement (SSC) was the most massive geomagnetic storm of the year due to the X9 solar flare caused by a coronal mass ejection (CME). IMF-Bz and Dst values increase...
متن کاملتأثیر شرایط امواج نامنظم بر عرض فرسایش یافته موجشکنهای سکویی شکلپذیر
The berm recession of a reshaping berm breakwater has a very important role in the stability and reshaping of this structure. In this research, the recession of the berm due to wave parameters has been studied based on 2D experimental modeling method in a wave flume. Irregular waves with JONSWAP spectrum were used. A total of 60 tests have been performed to cover the impact of wave parameters s...
متن کاملUsing TIGGE Data to Diagnose Initial Perturbations and Their Growth for Tropical Cyclone Ensemble Forecasts
Ensemble initial perturbations around Typhoon Sinlaku (2008) produced by ECMWF, NCEP, and the Japan Meteorological Agency (JMA) ensembles are compared using The Observing System Research and Predictability Experiment (THORPEX) Interactive Grand Global Ensemble (TIGGE) data, and the dynamical mechanisms of perturbation growth associated with the tropical cyclone (TC) motion are investigated for ...
متن کاملA new metric for comparing precipitation patterns with an application to ensemble forecasts
[1] Ensemble forecasting can be seen as serving two purposes: (1) by comparison of the control and ensemble members to the observed precipitation field, one can assess the forecast performance probabilistically; and (2) by comparison of ensemble members to the control forecast, one can assess the ‘‘diversity’’ of an ensemble and quantify the uncertainty of the forecast. Both problems are ground...
متن کامل