Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches
نویسندگان
چکیده
The effective maintenance scheduling of power system generators is very important for the economical and reliable operation of a power system. his represents a tough scheduling problem which continues to present a challenge for efficient optimization solution techniques. This paper resents the application of metaheuristic approaches, such as a genetic algorithm (GA), simulated annealing (SA) and their hybrid for generator aintenance scheduling (GMS) in power systems using an integer representation. This paper mainly focuses on the application of GA/SA and A/SA/heuristic hybrid approaches. GA/SA hybrid uses the probabilistic acceptance criterion of SA within the GA framework. GA/SA/heuristic ybrid combines heuristic approaches within the GA/SA hybrid to seed the initial population. A case study is formulated in this paper as an nteger programming problem using a reliability-based objective function and typical problem constraints. The implementation and performance f the metaheuristic approaches and their hybrid for the test case study are discussed. The results obtained are promising and show that the hybrid pproaches are less sensitive to the variations of technique parameters and offer an effective alternative for solving the generator maintenance cheduling problem. 2006 Elsevier B.V. All rights reserved.
منابع مشابه
Evolutionary hybrid approaches for generation scheduling in power systems
Generation scheduling (GS) in power systems is a tough optimisation problem which continues to present a challenge for efficient solution techniques. The solution is to define on/off decisions and generation levels for each electricity generator of a power system for each scheduling interval. The solution procedure requires simultaneous consideration of binary decision and continuous variables....
متن کاملThree Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint
Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...
متن کاملA New Hybrid Meta-Heuristics Approach to Solve the Parallel Machine Scheduling Problem Considering Human Resiliency Engineering
This paper proposes a mixed integer programming model to solve a non-identical parallel machine (NIPM) scheduling with sequence-dependent set-up times and human resiliency engineering. The presented mathematical model is formulated to consider human factors including Learning, Teamwork and Awareness. Moreover, processing time of jobs are assumed to be non-deterministic and dependent to their st...
متن کاملOptimum scheduling of the HRES for an isolated rural city in Iran
It is necessary to form an energy system in order to deliver the electrical power to a region that delivering energy to them from the national grid is not possible. At the moment, using the hybrid renewable energy systems (HRES) is the suggestion of more articles and scientific books because of environmental problems, nearing to the end of fossil fuels, and challenges including unpredictability...
متن کاملFinding the Minimum Distance from the National Electricity Grid for the Cost-Effective Use of Diesel Generator-Based Hybrid Renewable Systems in Iran
The electricity economy and its excessive consumption have become one of the main concerns of the Iranian government for many years. This issue, along with recent droughts, shows the need to use renewable energy that is free and clean and does not require water. In addition, due to the high cost of cable-laying and maintenance of power lines, it is not at all an option at all distances over the...
متن کامل