Solving the Periodic Maintenance Scheduling Problem via Genetic Algorithm to Balance Workforce Levels and Maintenance Cost
نویسندگان
چکیده
Problem statement: In this article we address the multi-objective Periodic Maintenance Scheduling Problem (PMSP) of scheduling a set of cyclic maintenance operations for a given set of machines through a specified planning period to minimize the total variance of workforce levels measured in man-hours and maintenance costs with equal weights. Approach: The article proposed a mixed integer non-linear math programming model and a linearised model for the PMSP. Also, we proposed a Genetic Algorithm (GA) for solving the problem using a new genome representation considered as a new addition to the maintenance scheduling literature. The algorithms were compared on a set of representative test problems. Results: The developed GA proves its capability and superiority to find good solutions for the PMSP and outperforms solutions found by the commercial optimization package CPLEX. The results indicated that the developed algorithms were able to identify optimal solutions for small size problems up to 5 machines and 6 planning periods.The GAs defined solutions in 22 seconds consuming less than two kilobytes with a reliability of 0.84 while the nonlinear and linear models consumes on average 705 and 37 kilobytes respectively. Conclusion: The developed GA could define solutions of average performance of 0.34 and 0.8 for the linearized algorithm compared with lower bound defined by the nonlinear math programming model. We hope to expand the developed algorithms for integrating maintenance planning and aggregate production planning problems.
منابع مشابه
Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint
Stochastic flexible flow shop scheduling problem (SFFSSP) is one the main focus of researchers due to the complexity arises from inherent uncertainties and also the difficulty of solving such NP-hard problems. Conventionally, in such problems each machine’s job process time may encounter uncertainty due to their relevant random behaviour. In order to examine such problems more realistically, fi...
متن کاملJIT single machine scheduling problem with periodic preventive maintenance
This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...
متن کاملOptimizing the preventive maintenance scheduling by genetic algorithm based on cost and reliability in National Iranian Drilling Company
The present research aims at predicting the required activities for preventive maintenance in terms of equipment optimal cost and reliability. The research sample includes all offshore drilling equipment of FATH 59 Derrick Site affiliated with National Iranian Drilling Company. Regarding the method, the research uses a field methodology and in terms of its objectives, it is classified as an app...
متن کاملUsing Genetic Algorithm to Robust Multi Objective Optimization of Maintenance Scheduling Considering Engineering Insurance
Efficient and on-time maintenance plays a crucial role inreducing cost and increasing the market share of an industrial unit. Preventivemaintenance is a broad term that encompasses a set of activitiesaimed at improving the overall reliability and availability of a systembefore machinery breakdown. The previous studies have addressed thescheduling of preventive maintenance. These studies have co...
متن کاملModelling and solving the job shop scheduling Problem followed by an assembly stage considering maintenance operations and access restrictions to machines
This paper considers job shop scheduling problem followed by an assembly stage and Lot Streaming (LS). It is supposed here that a number of products have been ordered to be produced. Each product is assembled with a set of several parts. The production system includes two stages. The first stage is a job shop to produce parts. Each machine can process only one part at the same time. The second ...
متن کامل