FOCUS OF TIPSTER PHASES I and II

نویسندگان

  • Patrick J. Altomari
  • Patricia A. Currier
چکیده

The TIPSTER Program began in June 1989 just after the conclusion of the second Message Understanding Conference (MUC-2). The concept which the Advanced Research Projects Agency (ARPA) put forward at that time was based on the promising results of that conference and on the belief that the technologies being demonstrated at MUC for the automated handling oflarge volumes of text would be of great benefit to a variety of Government agencies.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

List Of Available Documents

The following additional background information from TIPSTER Text Phases I and 1/ can be purchased from the sources indicated.

متن کامل

Enhancing Detection through Linguistic Indexing and Topic Expansion

Natural language processing techniques may hold a tremendous potential for overcoming the inadequacies of purely quantitative methods of text information retrieval. Under the Tipster contracts in phases I through III, GE group has set out to explore this potential through development and evaluation of new text processing techniques. This work resulted in some significant advances and in a bette...

متن کامل

Application of Case I and Case II of Hill’s 1979 Yield Criterion to Predict FLD

Forming limit diagrams (FLDs) are calculated based on both the Marciniak and Kuczynski (M-K)  model and the analysis proposed by Jones and Gillis (J-G). J-G analysis consisted of plastic deformation approximation by three deformation phases. These phases consisted of homogeneous deformation up to the maximum load (Phase I), deformation localization under constant load (phase II) and local necki...

متن کامل

The Lockheed Martin TIPSTER II Project

The Lockheed Martin TIPSTER II project focused on several research areas. In addition, three demonstration projects are underway to exhibit the feasibility of transitioning the research into an operational setting. in text together with a set of tools for easily constructing recognizers for new objects. In addition, the group has advanced the state of the art for identifying co-referential noun...

متن کامل

The NYU TIPSTER II Project

Dr. Ralph Grishman steered the Architecture Working Group, and led its subset, the Contractors' Architecture Working Group (CAWG), in the development of the Architecture Design and the implementation of that design in the two Architecture demonstrations, the first shown at the TIPSTER Phase II 6-Month Workshop in November 1994, and the second at the 12-Month Workshop in May 1995. He continues t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1996