Structural Parameters for Scheduling with Assignment Restrictions

نویسندگان

  • Klaus Jansen
  • Marten Maack
  • Roberto Solis-Oba
چکیده

We consider scheduling on identical and unrelated parallel machines with job assignment restrictions. These problems are NP-hard and they do not admit polynomial time approximation algorithms with approximation ratios smaller than 1.5 unless P=NP. However, if we impose limitations on the set of machines that can process a job, the problem sometimes becomes easier in the sense that algorithms with approximation ratios better than 1.5 exist. We introduce three graphs, based on the assignment restrictions and study the computational complexity of the scheduling problem with respect to structural properties of these graphs, in particular their treeand rankwidth. We identify cases that admit polynomial time approximation schemes or FPT algorithms, generalizing and extending previous results in this area.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Benders’ decomposition algorithm to solve bi-level bi-objective scheduling of aircrafts and gate assignment under uncertainty

Management and scheduling of flights and assignment of gates to aircraft play a significant role to improve the performance of the airport, due to the growing number of flights and decreasing the flight times. This research addresses the assignement and scheduling problem of runways and gates simultaneously. Moreover, this research is the first study that considers the constraint of unavailabil...

متن کامل

A PTAS for Scheduling with Tree Assignment Restrictions

Scheduling with assignment restrictions is an important special case of scheduling unrelated machines which has attracted much attention in the recent past. While a lower bound on approximability of 3/2 is known for its most general setting, subclasses of the problem admit polynomialtime approximation schemes. This note provides a PTAS for tree-like hierarchical structures, improving on a recen...

متن کامل

SINGLE MACHINE DUE DATE ASSIGNMENT SCHEDULING PROBLEM WITH PRECEDENCE CONSTRAINTS AND CONTROLLABLE PROCESSING TIMES IN FUZZY ENVIRONMENT

In this paper, a due date assignment scheduling problem with precedence constraints and controllable processing times in uncertain environment is investigated, in which the basic processing time of each job is assumed to be the symmetric trapezoidal fuzzy number, and the linear resource consumption function is used.The objective is to minimize the crisp possibilistic mean (or expected) value of...

متن کامل

Concurrent Locomotive Assignment and Freight Train Scheduling

The locomotive assignment and the freight train scheduling are important problems in railway transportation. Freight cars are coupled to form a freight rake. The freight rake becomes a train when a locomotive is coupled to it. The locomotive assignment problem assigns locomotives to a set of freight rakes in a way that, with minimum locomotive deadheading time, rake coupling delay and locomotiv...

متن کامل

Scheduling of undergraduate thesis examination: a case study in Industrial Engineering Department of Universitas Sebelas Maret

Undergraduate thesis examination in Industrial Engineering Department of Universitas Sebelas Maret conducted through two stages, namely intermediate and final examination. Currently, the scheduling process of such examinations is done by the undergraduate thesis coordinator manually without certain systematic method or approach. In this paper, we develop an optimization model for the examinatio...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2017