Condition-based Maintenance Problem of a Consecutive-k-out-of-n: F System with Load-Sharing Dependent Components
نویسندگان
چکیده
A maintenance problem of a linear consecutivek-out-of-n: F system with load-sharing dependent components is considered. This system consists of n components which are arranged linearly and fails if k consecutive components fail [1]. This system is commonly found in the integrated circuits, relay stations in telecommunication system, oil pipeline system, vacuum system in accelerators, and spacecraft relay stations [2]. Many studies have been done for this system. However, the studies focused on how to calculate the exact system reliability or the efficient lower bound of the system reliability. System design problems have also been considered in previous studies. However, there are a very few studies considering the maintenance problem for this system. Bollinger and Salvia built a recursive equation to calculate the reliability of a consecutive-k-out-of-n: F system [3]. Lambiris and Papastavridis proposed a model for the system reliabilities of linear and circular consecutive-k-out-of-n: F systems [4]. Pekoz and Ross simplified the model in Lambiris and Papastavridis [5]. Canfield and McCormick proposed an asymptotic reliability model [6]. Yun, Kim, and Yamamoto proposed a modified formula to calculate the system reliability of a circular consecutive-k-out-of-n: F system and a method to find the optimal system design for the circular consecutive-k-outof-n: F system with (k-1)-step Markov dependence [7]. Flynn and Chung proposed a maintenance policy related to the critical component policies (CCP) for consecutive-k-out-of-n: F systems [8]. The failed components are replaced only if the components are in the critical component set. They used a branch and bound algorithm to find the optimal CCP. Zuo and Wu studied an age replacement policy for k-out-of-n: F system and consecutive-k-out-of-n: F system [9]. Yun, Kim, and Yamamoto considered system design problems and age replacement policy for linear and circular consecutive-k-out-of-n: F systems with load sharing dependence [10]. Yun and Endharta developed a condition-based maintenance policy for linear consecutive-k-out-of-n: F systems and linear connected-(r, s)-out-of-(m, n): F systems and used simulation to get the optimal decision variable [11]. In this paper, we study a maintenance problem for a linear consecutive-k-out-of-n: F system. A condition-based maintenance policy which has been developed in Yun and Endharta [11] is used. If there is at least one minimal cut set with one working component, a preventive maintenance will be done after a certain time interval. If the system fails before reaching the preventive maintenance time, the system will be maintained correctively at failure time. We consider two scenarios. First, we replace all components at maintenance time and second, we replace only failed components at maintenance time. We derive the mathematical model analytically to find the expected cost rate value for both scenarios. The optimal preventive maintenance time interval (TCr) is obtained by minimizing the expected cost rate. The policy is compared to the existing maintenance policies, such as corrective maintenance and age PM policies. The assumptions used in the paper are as follows: Components and system have two states: working and failed. Time when there is one minimal cut set with one working component can be known, but the failed components are unknown. Replacement times are negligible. Component failure times are independent, identical and following an exponential distribution with parameter λ.
منابع مشابه
Number of Minimal Path Sets in a Consecutive-k-out-of-n: F System
In this paper the combinatorial problem of determining the number of minimal path sets of a consecutive-k-out-of-n: F system is considered. For the cases where k = 2, 3 the explicit formulae are given and for k ≥ 4 a recursive relation is obtained. Direct computation for determining the number of minimal path sets of a consecutive-k-out-of-n: F system for k ≥ 4 remains a difficult task. ...
متن کاملVoltage Control and Load Sharing in a DC Islanded Microgrid Based on Disturbance Observer
Increasing DC loads along with DC nature of distributed energy resources (DERs) raises interest to DC microgrids. Conventional droop/non-droop power-sharing in microgrids suffers from load dependent voltage deviation, slow transient response, and requires the parameters of the loads, system and DERs connection status. In this paper, a new nonlinear decentralized back-stepping control strategy f...
متن کاملRedundancy allocation problem for k-out-of-n systems with a choice of redundancy strategies
To increase the reliability of a specific system, using redundant components is a common method which is called redundancy allocation problem (RAP). Some of the RAP studies have focused on k-out-of-n systems. However, all of these studies assumed predetermined active or standby strategies for each subsystem. In this paper, for the first time, we propose a k-out-of-<em...
متن کاملOptimal Sizing of a Reliable Hydrogen-based Stand-alone Wind-Fuel Cell System
A hybrid wind/ fuel cell generation system is designed to supply power demand. The aim of this design is to minimize the total cost of the hybrid system over an expected 20 years of operation. The optimization problem is solved aimed at providing a reliable supply for the consumer’s demand. The system consists of fuel cells, some wind units, some electrolyzers, a reformer, an anaerobic reactor ...
متن کاملA time-shared machine repair problem with mixed spares under N-policy
The present investigation deals with a machine repair problem consisting of cold and warm standby machines. The machines are subject to breakdown and are repaired by the permanent repairman operating under N-policy. There is provision of one additional removable repairman who is called upon when the work load of failed machines crosses a certain threshold level and is removed as soon as the wor...
متن کامل