We study the problem where a task (or multiple unrelated tasks) must be executed, there are multiple machines/agents that can potentially perform the task, and our objective is to minimize the expected sum of the agents’ processing times. Each agent does not know exactly how long it will take him to finish the task; he only knows the distribution from which this time is drawn. These times are independent across agents and the distributions fulfill the monotone hazard rate condition. Agents are selfish and will lie about their distributions if this increases their expected utility. We study different variations of the Vickrey mechanism that take as input the agents’ reported distributions and the players’ realized running times and that output a schedule that minimizes the expected sum of processing times, as well as payments that make it an ex-post equilibrium for the agents to both truthfully report their distributions and exert full effort to complete the task. We devise the ChPE mechanism, which is uniquely tailored to our problem, and has many desirable properties including: not rewarding agents that fail to finish the task and having non-negative payments.
منابع مشابه
Developing Robust Project Scheduling Methods for Uncertain Parameters
A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...
متن کاملRobust H2 switching gain-scheduled controller design for switched uncertain LPV systems
In this article, a new approach is proposed to design robust switching gain-scheduled dynamic output feedback control for switched uncertain continuous-time linear parameter varying (LPV) systems. The proposed robust switching gain-scheduled controllers are robustly designed so that the stability and H2-gain performance of the switched closed-loop uncertain LPV system can be guaranteed even und...
متن کاملRobust gain-scheduled control of linear parameter-varying systems with uncertain scheduling parameters in the presence of the time-invariant uncertainties
In this paper, a new approach is presented to design a gain-scheduled state-feedback controller for uncertain linear parameter-varying systems. It is supposed that the state-space matrices of them are the linear combination of the uncertain scheduling parameters. It is assumed that the existed uncertainties are of type of time-invariant parametric uncertainties with specified intervals. Simulta...
متن کاملAn Effective Task Scheduling Framework for Cloud Computing using NSGA-II
Cloud computing is a model for convenient on-demand user’s access to changeable and configurable computing resources such as networks, servers, storage, applications, and services with minimal management of resources and service provider interaction. Task scheduling is regarded as a fundamental issue in cloud computing which aims at distributing the load on the different resources of a distribu...
متن کاملA chance-constrained multi-objective model for final assembly scheduling in ATO systems with uncertain sub-assembly availability
A chance-constraint multi-objective model under uncertainty in the availability of subassemblies is proposed for scheduling in ATO systems. The on-time delivery of customer orders as well as reducing the company's cost is crucial; therefore, a three-objective model is proposed including the minimization of1) overtime, idletime, change-over, and setup costs, 2) total dispersion of items’ deliver...
متن کاملUncertain Resource Availabilities: Proactive and Reactive Procedures for Preemptive Resource Constrained project Scheduling Problem
Project scheduling is the part of project management that deals with determining when intime to start (and finish) which activities and with the allocation of scarce resources to theproject activities. In practice, virtually all project managers are confronted with resourcescarceness. In such cases, the Resource-Constrained Project Scheduling Problem (RCPSP)arises. This optimization problem has...