Dynamic Journey Time Estimation in Stochastic Road Networks with Uncertainty

نویسندگان

  • Qiong TANG
  • Xingang LI
چکیده

This paper investigates the dynamic journey time estimation (DJTE) problem, which can be used to estimate simultaneously the mean and standard deviation (SD) of path journey times in stochastic road networks. In this paper, a bi-level programming model is proposed to solve the DJTE problem. The upper level is to minimize the deviations of the mean and SD between the estimated and observed path journey times. The low level is a reliability-based dynamic traffic assignment model with taking account the variation of path journey times. The modified simulated annealing (SA) algorithm is adapted to solve the proposed bi-level problem. Numerical example is used to illustrate the application of the proposed DJTE model and the modified algorithm together with some insightful findings.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Dynamic Facility Location with Stochastic Demand

Determination of facilities, such as factories or warehouses, location and availability conditions is one of the important and strategic decisions for an organization to make. Transportation costs that form a major part of goods price are dependent to this decision making. There are verity of methods have been presented to achieve the optimal locations of these facilities which are generally de...

متن کامل

Uncertainty in fundamental natural frequency estimation for alluvial deposits

Seismic waves are filtered as they pass through soil layers, from bedrock to surface. Frequencies and amplitudes of the response wave are affected due to this filtration effect and this will result in different ground motion characteristics. Therefore, it is important to consider the impact of the soil properties on the evaluation of earthquake ground motions for the design of structures. Soil ...

متن کامل

Expected Duration of Dynamic Markov PERT Networks

Abstract : In this paper , we apply the stochastic dynamic programming to approximate the mean project completion time in dynamic Markov PERT networks. It is assumed that the activity durations are independent random variables with exponential distributions, but some social and economical problems influence the mean of activity durations. It is also assumed that the social problems evolve in ac...

متن کامل

Two-Stage Stochastic Day-Ahead Market Clearing in Gas and Power Networks Integrated with Wind Energy

The significant penetration rate of wind turbines in power systems made some challenges in the operation of the systems such as large-scale power fluctuations induced by wind farms. Gas-fired plants with fast starting ability and high ramping can better handle natural uncertainties of wind power compared to other traditional plants. Therefore, the integration of electrical and natural gas syste...

متن کامل

A Framework for Uncertainty Quantification in Nonlinear Multi-body System Dynamics

This paper outlines a methodology for determining the statistics associated with the time evolution of a nonlinear multi-body dynamic system operated under input uncertainty. The focus is on the dynamics of ground vehicle systems in environments characterized by multiple sources of uncertainty: road topography, friction coefficient at the road/tire interface and aerodynamic force loading. Drawi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015