Design of an Efficient Genetic Algorithm to Solve the Industrial Car Sequencing Problem
نویسندگان
چکیده
In many industrial sectors, decision makers are faced with large and complex problems that are often multi-objective. Many of these problems may be expressed as a combinatorial optimization problem in which we define one or more objective functions that we are trying to optimize. Thus, the car sequencing problem in an assembly line is a well known combinatorial optimization problem that cars manufacturers face. This problem involves scheduling cars along an assembly line composed of three consecutive shops: body welding and construction, painting and assembly. In the literature, this problem is most often treated as a single objective problem and only the capacity constraints of the assembly shop are considered (Dincbas et al., 1988). In this workshop, each car is characterized by a set of different options and the workstations where each option is installed are designed to handle a certain percentage of cars requiring the same options. To smooth the workload at the critical assembly workstations, cars requiring high work content must be dispersed throughout the production sequence. Industrial car sequencing formulation subdivides the capacity constraints into two categories, that are the capacity constraints linked to the highpriority options and the capacity constraints linked to the low-priority options. However, the reality of industrial production does not only take into account the assembly shop requirements. The industrial formulation proposed by French automobile manufacturer Renault, in the context of the ROADEF 2005 Challenge, also takes into account the paint shop requirements. In this workshop, the minimization of the amount of solvent used to purge the painting nozzles for colour changeovers, or when a known maximum number of vehicle bodies of the same colour have been painted, is an important objective to consider. Indeed, long sequences of cars of the same colour tend to render visual quality controls inaccurate. To ensure this quality control, the number of cars of the same colour must not exceed an upper limit. The industrial car sequencing problem (ICSP) is thus a multi-objective problem in nature, with three conflicting objectives to minimize. In the assembly shop, one tries to minimize the number of violations of capacity constraints related to high-priority options (HPO) and to low-priority options (LPO). In the paint shop, one tries to minimize the number of colour changes (COLOUR). In the 2005 ROADEF Challenge, the Renault automobile manufacturer proposes to tackle the problem by treating the three objectives lexicographically. O pe n A cc es s D at ab as e w w w .ite ch on lin e. co m
منابع مشابه
A novel hybrid genetic algorithm to solve the make-to-order sequence-dependent flow-shop scheduling problem
Flow-shop scheduling problem (FSP) deals with the scheduling of a set of n jobs that visit a set of m machines in the same order. As the FSP is NP-hard, there is no efficient algorithm to reach the optimal solution of the problem. To minimize the holding, delay and setup costs of large permutation flow-shop scheduling problems with sequence-dependent setup times on each machine, this pap...
متن کاملSolving a New Multi-Period Mathematical Model of the Rail-Car Fleet Size and Car Utilization by Simulated Annealing
There is a significant interaction between sizing a fleet of rail cars and its utilization. This paper presents a new multi-period mathematical model and a solution procedure to optimize the rail-car fleet size and freight car allocation, wherein car demands, and travel times, are assumed to be deterministic, and unmet demands are backordered. This problem is considered NP-complete. In other wo...
متن کاملGenetic Algorithm-Based Optimization Approach for an Uncapacitated Single Allocation P-hub Center Problem with more realistic cost structure
A p-hub center network design problem is definition of some nodes as hubs and allocation of non-hub nodes to them wherein the maximum travel times between any pair of nodes is minimized. The distinctive feature of this study is proposing a new mathematical formulation for modeling costs in a p-hub center problem. Here, instead of considering costs as a linear function of distance, for the first...
متن کاملA New Hybrid Meta-Heuristics Approach to Solve the Parallel Machine Scheduling Problem Considering Human Resiliency Engineering
This paper proposes a mixed integer programming model to solve a non-identical parallel machine (NIPM) scheduling with sequence-dependent set-up times and human resiliency engineering. The presented mathematical model is formulated to consider human factors including Learning, Teamwork and Awareness. Moreover, processing time of jobs are assumed to be non-deterministic and dependent to their st...
متن کاملDesign of a Hybrid Genetic Algorithm for Parallel Machines Scheduling to Minimize Job Tardiness and Machine Deteriorating Costs with Deteriorating Jobs in a Batched Delivery System
This paper studies the parallel machine scheduling problem subject to machine and job deterioration in a batched delivery system. By the machine deterioration effect, we mean that each machine deteriorates over time, at a different rate. Moreover, job processing times are increasing functions of their starting times and follow a simple linear deterioration. The objective functions are minimizin...
متن کاملAn integrated approach for scheduling flexible job-shop using teaching–learning-based optimization method
In this paper, teaching–learning-based optimization (TLBO) is proposed to solve flexible job shop scheduling problem (FJSP) based on the integrated approach with an objective to minimize makespan. An FJSP is an extension of basic job-shop scheduling problem. There are two sub problems in FJSP. They are routing problem and sequencing problem. If both the sub problems are solved simultaneously, t...