Fully Polynomial Time Approximation Schemes for Time-Cost Tradeoff Problems in Series-Parallel Project Networks
نویسندگان
چکیده
We consider the deadline problem and budget problem of the nonlinear time-cost tradeoff project scheduling model in a series-parallel activity network. We develop fully polynomial time approximation schemes for both problems using K-approximation sets and functions, together with series and parallel reductions.
منابع مشابه
A New Mathematical Approach based on Conic Quadratic Programming for the Stochastic Time-Cost Tradeoff Problem in Project Management
In this paper, we consider a stochastic Time-Cost Tradeoff Problem (TCTP) in PERT networks for project management, in which all activities are subjected to a linear cost function and assumed to be exponentially distributed. The aim of this problem is to maximize the project completion probability with a pre-known deadline to a predefined probability such that the required additional cost is min...
متن کاملMulti-objective optimization of discrete time–cost tradeoff problem in project networks using non-dominated sorting genetic algorithm
The time–cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate e...
متن کاملEffects of Project Uncertainties on Nonlinear Time-Cost Tradeoff Profile
This study presents the effects of project uncertainties on nonlinear time-cost tradeoff (TCT) profile of real life engineering projects by the fusion of fuzzy logic and artificial neural network (ANN) models with hybrid meta-heuristic (HMH) technique, abridged as Fuzzy-ANN-HMH. Nonlinear time-cost relationship of project activities is dealt with ANN models. ANN models are then integrated with ...
متن کاملA New Multi-objective Model for Multi-mode Project Planning with Risk
The purpose of this problem is to choose a set of project activities for crashing, in a way that the expected project time, cost and risk are minimized and the expected quality is maximized. In this problem, each project activity can be performed with a specific executive mode. Each executive mode is characterized with four measures, namely the expected time, cost, quality and risk. In this pap...
متن کاملParallelizing Assignment Problem with DNA Strands
Background:Many problems of combinatorial optimization, which are solvable only in exponential time, are known to be Non-Deterministic Polynomial hard (NP-hard). With the advent of parallel machines, new opportunities have been emerged to develop the effective solutions for NP-hard problems. However, solving these problems in polynomial time needs massive parallel machines and ...