no-idle time scheduling of open shops: modeling and metaheuristic solution methods
نویسندگان
چکیده
in some industries as foundries, it is not technically feasible to interrupt a processor between jobs. this restriction gives rise to a scheduling problem called no-idle scheduling. this paper deals with scheduling of no-idle open shops to minimize maximum completion time of jobs, called makespan. the problem is first mathematically formulated by three different mixed integer linear programming models. since open shop scheduling problems are np-hard, only small instances can be solved to optimality using these models. thus, to solve large instances, two meta-heuristics based on simulated annealing and genetic algorithms are developed. a complete numerical experiment is conducted and the developed models and algorithms are compared. the results show that genetic algorithm outperforms simulated annealing.
منابع مشابه
No-idle time Scheduling of Open shops: Modeling and Meta-heuristic Solution Methods
In some industries as foundries, it is not technically feasible to interrupt a processor between jobs. This restriction gives rise to a scheduling problem called no-idle scheduling. This paper deals with scheduling of no-idle open shops to minimize maximum completion time of jobs, called makespan. The problem is first mathematically formulated by three different mixed integer linear programming...
متن کاملModeling and scheduling no-idle hybrid flow shop problems
Although several papers have studied no-idle scheduling problems, they all focus on flow shops, assuming one processor at each working stage. But, companies commonly extend to hybrid flow shops by duplicating machines in parallel in stages. This paper considers the problem of scheduling no-idle hybrid flow shops. A mixed integer linear programming model is first developed to mathematically form...
متن کاملmodeling and scheduling no-idle hybrid flow shop problems
although several papers have studied no-idle scheduling problems, they all focus on flow shops, assuming one processor at each working stage. but, companies commonly extend to hybrid flow shops by duplicating machines in parallel in stages. this paper considers the problem of scheduling no-idle hybrid flow shops. a mixed integer linear programming model is first developed to mathematically form...
متن کاملOn-line scheduling of small open shops
We investigate the problem of on-line scheduling open shops of two and three machines with an objective of minimizing the schedule makespan. We 1rst propose a 1.848-competitive permutation algorithm for the non-preemptive scheduling problem of two machines and show that no permutation algorithm can be better than 1.754-competitive. Secondly, we develop a (27=19)-competitive algorithm for the pr...
متن کاملNo-wait flexible flowshop scheduling with no-idle machines
This paper considers a two-stage flexible flowshop scheduling problem with no waiting time between two sequential operations of a job and no idle time between two consecutive processed jobs on machines of the second stage. We show its complexity and present a heuristic algorithm with asymptotically tight error bounds. © 2004 Elsevier B.V. All rights reserved.
متن کاملLiterature Survey: Metaheuristic Methods for Task Scheduling
Traditional methods used in optimization are deterministic, fast, and give exact answers but often tends to get stuck on local optima. Complexity class of the task scheduling problem belongs to NP-complete involving extremely large search space with correspondingly large number of potential solutions and takes much longer time to find the optimal solution. There is no readymade and well defined...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
international journal of supply and operations managementISSN 2383-1359
دوره 1
شماره 1 2014
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023