evaluation of tbm utilization using rock mass rating system: a case study of karaj-tehran water conveyance tunnel (lots 1 and 2)

نویسندگان

omid frough

seyed rahman torabi

majid tajik

چکیده

successful application of a tbm in a project requires investigating both the ground conditions and the machine and backup system design features. prediction of the machine performance is very important as it has a big effect on the duration of the project and the costs. in this respect, both penetration rate and advance rate must be estimated. utilization factor, which depends on the type of operation, management, maintenance, geological conditions, mucking delays and other downtimes, correlates the advance rate and penetration rate. adverse rock mass conditions such as mixed face condition, water problem and instability of rock have a great role in tbm downtimes and reduce the machine utilization considerably. based on  detailed engineering geological reports and maps and daily site reports taken from karaj-tehran water conveyance tunnel ( lots 1 and 2), this paper evaluates, main rock mass properties utilized for the estimation of tbm performance and discusses their effect on the machine utilization. . more specifically it uses the developed database also contains daily boring time, different rock mass related downtimes, daily advance and length of bored tunnel in each engineering geological units. it is concluded that the percentage of the rock mass related downtimes can be estimated via rmr within reliable coefficient of determination.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Evaluation of TBM Utilization Using Rock Mass Rating System: A Case Study of Karaj-Tehran Water Conveyance Tunnel (Lots 1 and 2)

Successful application of a TBM in a project requires investigating both the ground conditions and the machine and backup system design features. Prediction of the machine performance is very important as it has a big effect on the duration of the project and the costs. In this respect, both penetration rate and advance rate must be estimated. Utilization factor, which depends on the type of op...

متن کامل

Tunnel Rehabilitation in Fault Zone Using Sequential Joints Method- Case Study: Karaj Water Conveyance Tunnel

The lining structure of Tunnel Boring Machine (TBM) excavated tunnels is composed of series of precast Reinforced Concrete (RC) pieces which are called segment. At the present paper, a novel method is introduced for seismic retrofitting of segmental tunnels located at active fault zones in rock environment with case study of Amirkabir dam to Tehran water transfer tunnel (Karadj tunnel). The mai...

متن کامل

Engineering geological studies used for redesigning and employing a hard rock TBM in soft rock formations of Chamshir water conveyance tunnel

The Chamshir water conveyance tunnel (CWCT) with a length of 7.4 km and boring diameter of 5.3 m is excavated using a refurbished single shield TBM, initially designed to work in hard rock formations. This study focuses on engineering geological issues, which are important for checking the suitability of this machine and proposing required modifications for improving its performance in soft roc...

متن کامل

a case study of the two translators of the holy quran: tahereh saffarzadeh and laleh bakhtiar

بطورکلی، کتاب های مقدسی همچون قران کریم را خوانندگان میتوان مطابق با پیش زمینه های مختلفی که درند درک کنند. محقق تلاش کرده نقش پیش زمینه اجتماعی-فرهنگی را روی ایدئولوژی های مترجمین زن و در نتیجه تاثیراتش را روی خواندن و ترجمه آیات قرآن کریم بررسی کند و ببیند که آیا تفاوت های واژگانی عمده ای میان این مترجمین وجود دارد یا نه. به این منظور، ترجمه 24 آیه از آیات قرآن کریم مورد بررسی مقایسه ای قرار ...

15 صفحه اول

Evaluation of structural analysis of tunnel segmental lining using beam-spring method and force-method (Case study: Chamshir water conveyance tunnel)

The joints between segmental rings can withstand a certain amount of bending moment as well as axial and shear forces. Generally, in the structural analysis of tunnel segmental lining, the joints can be modeled as elastic hinges or rotational springs, and their rigidity should be demonstrated in terms of the rigidity of the joints or their rotational stiffness. Therefore, the bending moment act...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید


عنوان ژورنال:
journal of mining and environment

ناشر: university of shahrood

ISSN 2251-8592

دوره 3

شماره 2 2012

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023