reliability-based maintenance scheduling of powered supports in tabas mechanized coal mine
نویسندگان
چکیده
utilizing the gathered failure data and failure interval data from tabas coal mine in two years, this paper discusses the reliability of powered supports. the data sets were investigated using statistical procedures and in two levels: the existence of trend and serial correlation. the results show that the powered supports follow the gamma reliability function. the reliability of the machine decreases to almost zero after 520 operation hours and after 80 hours the probability of failure of powered supports increases to 60 percent. the failure rate of powered support shows an improving behavior and therefore a decreasing failure rate. in the beginning of the process, the failure rate is 0.021 failures per hour. this reaches the rate of 0.012 after a sudden decrease, thence forward on a gently decreasing rate and after 100 hours gets to the rate of 0.01. regarding the maintenance policy and to protect the machine’s operation continuity, preventive maintenance strategy can be chosen. the reliability of the discussed machine can be maintained on a descent level by inspecting and controlling the parts in short term intervals. with regard to reliability plots of powered supports operation, preventive reliability-based maintenance time intervals for 80% reliability levels for powered supports is 15 hours.
منابع مشابه
Reliability-based maintenance scheduling of powered supports in Tabas mechanized coal mine
Utilizing the gathered failure data and failure interval data from Tabas coal mine in two years, this paper discusses the reliability of powered supports. The data sets were investigated using statistical procedures and in two levels: the existence of trend and serial correlation. The results show that the powered supports follow the Gamma reliability function. The reliability of the machine de...
متن کاملEstimation of reliability-based maintenance time intervals of Load-Haul-Dumper in an underground coal mine
Reliability estimation plays a significant role in the performance assessment of mining equipment, and aids in designing efficient and effective preventive maintenance strategies. Continuous and random/irregular occurrence of failures in a system could be the main cause for performance drop of machinery. The accomplishment of a projected level of production is possible only by an efficient oper...
متن کاملBi-level Model for Reliability based Maintenance and Job Scheduling
Many defects in manufacturing system are caused by human resources that show the significance of the human resources in manufacturing systems. Most manufacturers attempt to investigate the human resources in order to improve the work conditions and reduce the human error by providing a proper work-rest schedule. On the other hand, manufacturer deal with machine scheduling based on demand and wo...
متن کاملEstimation of coal seams gas content for evaluating potential use of methane drainage system in Tabas coal mine
Methane gas emission, accumulation, and explosion are the most important risk factors in underground coal mines. Hence, having a knowledge of methane gas emission potential in underground coal mines is of crucial importance in preventing the explosion risk, loss of life, and property, and providing miners' safety. The purpose of this work is to provide the prediction maps for the C1, C2, and B2...
متن کاملReliability Based Maintenance and Human Resources Work-Rest Scheduling in Manufacturing System
In today's competitive market, all manufacturers attempt to improve their maintenance policy in order to decrease the cost of failure and increase the quality of products, but most of these attempts do not consider the role of humans involved in a manufacturing system. Human resources are the main factor in manufacturing that has an undeniable effect on products quality, machines reliability, s...
متن کاملProbabilistic analysis of stability of chain pillars in Tabas coal mine in Iran using Monte Carlo simulation
Performing a probabilistic study rather than a determinist one is a relatively easy way to quantify the uncertainty in an engineering design. Due to the complexity and poor accuracy of the statistical moment methods, the Monte Carlo simulation (MCS) method is wildly used in an engineering design. In this work, an MCS-based reliability analysis was carried out for the stability of the chain pill...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
journal of mining and environmentناشر: university of shahrood
ISSN 2251-8592
دوره 5
شماره 2 2014
کلمات کلیدی
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023