the reliability of a tunnel boring machine

نویسندگان

mohammad javad jafari department of occupational health, faculty of health, university of shahid beheshti (mc), tehran, ir

nor-alddin gharari department of occupational health, faculty of health, university of shahid beheshti (mc), tehran, ir

hamid reza sheikhi department of occupational health, faculty of health, university of shahid beheshti (mc), tehran, ir

چکیده

greater levels of complexity in tunnelling with tunnel boring machine (tbm) allow higher chances of failures that may increase the potential hazardous risks. this paper presents the results of a study on tbm reliability using risk analysis. machinery failure mode and effect analysis was applied to analyze the risks of a tbm using qs9000 and sae.j1739 recommendations. for this purpose, 48 failure modes were postulated for the tbm main systems and all subsystems. afterwards, the effects of every failure were listed. safeguards or controls that might prevent or mitigate the effects of each failure were also listed. in the final step, essential remedial actions to prevent or mitigate the failure were recommended. risk matrix was developed for each possible failure to be used for risk ranking. for this, the risk priority number (rpn) was estimated for each failure mode for pro and post application of control measures to identify the most critical failures. the results revealed that 7 failure modes had risk priority numbers higher than 80 therefore, they were categorized unacceptable. cutter head stop due to bad rock condition with rpn=240 was the significant critical failure. the results also showed that 3 failure modes in tbm required modification due to high severity rate. the findings from this study were applied to a long tunnel under construction and significantly reduced the accidents during the next two years tunnelling period. it can be concluded that mfmea is a superb tool for tbm reliability evaluation and promotion.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Simulation of tunnel boring machine utilization: A case study

Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simula...

متن کامل

Tunnel boring machine positioning automation in tunnel construction

Purpose Tunnel construction using a tunnel boring machine (TBM) entails precise machine positioning and guidance in the underground space. In contrast to traditional laser-based machine guidance solutions, the proposed research aims to develop an automation alternative to facilitate TBMguidance and as-built tunnel alignment survey during tunnelling operations. Method A fully automated system is...

متن کامل

Airflow inside tunnel boring machine: A numerical study and an experimental verification

Knowledge of the airflow distribution inside a Tunnel Boring Machine (TBM) can create a safe working environment for workers and machinery. The airflow quality and the related mass flow rate in the ventilation system should be sufficient to dilute gases and remove dust inside the tunnel. In this work, airflow distribution in the single shield TBM tunnel was studied using computational fluid dyn...

متن کامل

Simulation Analysis of Rock Braking Mechanism of Tunnel Boring Machine

Original scientific paper Aiming at answering the questions of wear and failure of hob in the rock breaking process, the rock breaking process was simulated in different broken rock conditions by using finite element method. The relationship between normal force, lateral force, rolling force and time was obtained by rock breaking simulation analysis on the single edge disc cutter. The rock stre...

متن کامل

TUNNEL BORING MACHINE PENETRATION RATE PREDICTION BASED ON RELEVANCE VECTOR REGRESSION

key factor in the successful application of a tunnel boring machine (TBM) in tunneling is the ability to develop accurate penetration rate estimates for determining project schedule and costs. Thus establishing a relationship between rock properties and TBM penetration rate can be very helpful in estimation of this vital parameter. However, this parameter cannot be simply predicted since there ...

متن کامل

Analytical Tunnel-boring Machine Pose Precision and Sensitivity Evaluation for Underground Tunnelling

Practical Tunnel-boring Machine (TBM) guidance systems usually use sophisticated instruments to obtain the orientation of the TBM. These systems require frequent calibration and work shutdown, making the procedure complex and time consuming. Besides, the majority of current TBM guidance solutions cannot provide the position of the invisible cutter head analytically including commonly used laser...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید


عنوان ژورنال:
international journal of occupational hygiene

جلد ۱، شماره ۱، صفحات ۲۰-۲۵

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023