an efficient meta-heuristic algorithm for project scheduling with multiple modes

نویسندگان

محمد حسن سبط

محمدرضا افشار

یعقوب علیپوری

چکیده

in this paper, a fully informed particle swarm (fips) algorithm is proposed for solving the multi-mode resource-constrained project scheduling problem (mrcpsp) with minimization of project makespan as the objective subject to resource and precedence constraints. in the proposed fips, a random key and the related mode list (ml) representation scheme are used as encoding schemes and the multi-mode serial schedule generation scheme (mssgs) is considered as the decoding procedure. in particular, a new fitness function which reduces the average deviation from optimality and cpu-time is presented. comparing the results of the proposed fips with other approaches using the well-known benchmark sets in psplib validate the effectiveness of the proposed algorithm to solve the mrcpsp.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Genetic Algorithm and a Model for the Resource Constrained Project Scheduling Problem with Multiple Crushable Modes

Abstract: This paper presents an exact model and a genetic algorithm for the multi-mode resource constrained project scheduling problem with generalized precedence relations in which the duration of an activity is determined by the mode selection and the duration reduction (crashing) applied within the selected mode. All resources considered are renewable. The objective is to determine a mode, ...

متن کامل

An Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm

In this paper, we propose an energy-efficient mathematical model for the resource-constrained project scheduling problem to optimize makespan and consumption of energy, simultaneously. In the proposed model, resources are speed-scaling machines. The problem is NP-hard in the strong sense. Therefore, a multi-objective fruit fly optimization algorithm (MOFOA) is developed. The MOFOA uses the VIKO...

متن کامل

Project Scheduling with Multiple Modes: A Genetic Algorithm

In this paper we consider the resource-constrained project scheduling problem with multiple execution modes for each activity and makespan minimization as objective. We present a new genetic algorithm approach to solve this problem. The genetic encoding is based on a precedence feasible list of activities and a mode assignment. After defining the related crossover, mutation, and selection opera...

متن کامل

An Exact Algorithm for the Mode Identity Project Scheduling Problem

In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project schedulin...

متن کامل

Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)

Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...

متن کامل

Project scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study

Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید


عنوان ژورنال:
مهندسی عمران فردوسی

جلد ۲۷، شماره ۱، صفحات ۱۰۱-۰

کلمات کلیدی

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023