uncertainty analysis and overtopping risk evaluation of maroon dam withmonte carlo and latin hypercube methods

نویسندگان

جمال محمد ولی سامانی

حامد رادمهر

مجید دلاور

چکیده

introduction: the greatest part of constructed dams belongs to embankment dams and there are many examples of their failures throughout history. about one-third of the world’s dam failures have been caused by flood overtopping, which indicates that flood overtopping is an important factor affecting reservoir projects’ safety. moreover, because of a poor understanding of the randomness of floods, reservoir water levels during flood seasons are often lowered artificially in order to avoid overtopping and protect the lives and property of downstream residents. so, estimation of dam overtopping risk with regard to uncertainties is more important than achieving the dam’s safety. this study presents the procedure for risk evaluation of dam overtopping due to various uncertaintiess in inflows and reservoir initial condition. materials and methods: this study aims to present a practical approach and compare the different uncertainty analysis methods in the evaluation of dam overtopping risk due to flood. for this purpose, monte carlo simulation and latin hypercube sampling methods were used to calculate the overtopping risk, evaluate the uncertainty, and calculate the highest water level during different flood events. to assess these methods from a practical point of view, the maroon dam was chosen for the case study. figure. 1 indicates the work procedure, including three parts: 1) identification and evaluation of effective factors on flood routing and dam overtopping, 2) data collection and analysis for reservoir routing and uncertainty analysis, 3) uncertainty and risk analysis. figure 1- diagram of dam overtopping risk evaluation results and discussion: figure 2 shows the results of the computed overtopping risks for the maroon dam without considering the wind effect, for the initial water level of 504 m as an example. as it is shown in figure. 2, the trends of the risk curves computed by the different uncertainty analysis methods are similar. as it can be seen, the risk curves computed by the lhs are slightly higher than those curves computed by the mcs method. also as it is observed, the differences between risk values of the two methods increase in longer return periods. variations of overtopping risk with increasing the initial water level and return period related to overtopping risk in the 2-year return period for the initial water level of 470 m are shown in table1. the results show that elongation of return period plays a more important role in increasing the risk, than the increase of initial water level. t method 2→2 2→50 2→100 2→1000 2→5000 2→10000 470→470 mcs 1 5 9 23 42.36 58 470→478 2 7 15.6 37 58.34 79 470→485 5.6 13.6 28.6 55.6 85.67 112.6 470→493 10.3 32.6 54 95.6 127.34 152 470→504 40.3 83 117.3 165 200.34 224.3 470→470 lhs 1 5.34 11 25.3 43 60.3 470→478 2.3 8.6 18 39.3 60.67 84 470→485 5.3 17.3 32.6 58.3 89 114.6 470→493 13.3 37.6 57.6 97 133.34 160.3 470→504 41.6 87.3 119.6 173 205 233.3 figure 2- overtopping risk in the initial water level of 504 m, without considering the wind effect conclusions: this study applies mcs and lhs methods to analyze the uncertainty and evaluate the dam overtopping risk consideringthe uncertainties in input variables, such as quintile of flood peak discharge, initial levels of water and spill coefficients. the results show that the uncertainty of water level calculated by mcs is higher than that calculated by lhs. in addition, the overtopping risk calculated by lhs is higher than that calculated by mcs. furthermore, the increase of inflow rate influences the variations of the overtopping risk more than the increase of the return period. in addition, evaluation of the results indicates that the overtopping risk is an important issue in the maroon dam. so, a comprehensiverisk analysis procedure in conjunction with uncertainty gives very important information for decision makers to make better judgments in dam operation based on uncertainty in inputs.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Empirical Evaluation of Sampling Methods in Risk Analysis Simulation: Quasi-monte Carlo, Descriptive Sampling, and Latin Hypercube Sampling

This paper compares the performance, in terms of convergence rates and precision of the estimates, for six Monte Carlo Simulation sampling methods: Quasi-Monte Carlo using Halton, Sobol, and Faure numeric sequences; Descriptive Sampling, based on the use of deterministic sets and Latin Hypercube Sampling, based on stratified numerical sets. Those methods are compared to the classical Monte Carl...

متن کامل

the study of practical and theoretical foundation of credit risk and its coverage

پس از بررسی هر کدام از فاکتورهای نوع صنعت, نوع ضمانت نامه, نرخ بهره , نرخ تورم, ریسک اعتباری کشورها, کارمزد, ریکاوری, gdp, پوشش و وثیقه بر ریسک اعتباری صندوق ضمانت صادرات ایران مشخص گردید که همه فاکتورها به استثنای ریسک اعتباری کشورها و کارمزد بقیه فاکتورها رابطه معناداری با ریسک اعتباری دارند در ضمن نرخ بهره , نرخ تورم, ریکاوری, و نوع صنعت و ریسک کشورها اثر عکس روی ریسک اعتباری داردو پوشش, وثی...

15 صفحه اول

Commodity price uncertainty propagation in open-pit mine production planning by Latin hypercube sampling method

Production planning of an open-pit mine is a procedure during which the rock blocks are assigned to different production periods in a way that leads to the highest net present value (NPV) subject to some operational and technical constraints. This process becomes much more complicated by incorporation of the uncertainty existing in the input parameters. The commodity price uncertainty is among ...

متن کامل

A comparison of uncertainty and sensitivity analysis results obtained with random and Latin hypercube sampling

Uncertainty and sensitivity analysis results obtained with random and Latin hypercube sampling are compared. The comparison uses results from a model for two-phase fluid flow obtained with three independent random samples of size 100 each and three independent Latin hypercube samples (LHSs) of size 100 each. Uncertainty and sensitivity analysis results with the two sampling procedures are simil...

متن کامل

langauge needs analysis of undergraduate business management and economics students

the aim of conducting this study was to investigate the foreign language learning needs of undergraduate economics students and business management students in faculties of social sciences of alzahra and azad naragh university. in the study, which was designed on the basis of a qualitative-quantitative basis using interviews and questionnaires, 146 female undergraduate business management as we...

15 صفحه اول

a contrastive analysis of concord and head parameter in english and azerbaijani

این پایان نامه به بررسی و مقایسه دو موضوع مطابقه میان فعل و فاعل (از نظر شخص و مشار) و هسته عبارت در دو زبان انگلیسی و آذربایجانی می پردازد. اول رابطه دستوری مطابقه مورد بررسی قرار می گیرد. مطابقه به این معناست که فعل مفرد به همراه فاعل مفرد و فعل جمع به همراه فاعل جمع می آید. در انگلیسی تمام افعال، بجز فعل بودن (to be) از نظر شمار با فاعلشان فقط در سوم شخص مفرد و در زمان حال مطابقت نشان میدهند...

15 صفحه اول

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید


عنوان ژورنال:
آب و خاک

جلد ۲۹، شماره ۳، صفحات ۵۱۷-۰

کلمات کلیدی

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023