scheduling of unrelated parallel machines using two multi objective genetic algorithms with sequence-dependent setup times and precedent constraints
نویسندگان
چکیده
abstract: this paper considers the problem of scheduling n jobs on m unrelated parallel machines with sequence-dependent setup times. to better comply with industrial situations, jobs have varying due dates and ready times and there are some precedence relations between them. furthermore sequence-dependent setup times and anticipatory setups are included in the proposed model. the objective is to determine a schedule that minimizes makespan and number of tardy jobs. the problem is np-hard, so for obtaining an optimal solution in reasonable computational time, two multi objective genetic algorithms (moga) are proposed. to evaluate the proposed algorithms, random test problems are produced in medium and large sizes with tight due dates. after setting the parameters, the performances of these algorithms are evaluated using the concept of data envelopment analysis (dea), distance method, and a number of non-dominated solutions. keywords: genetic algorithm, makespan, multi-objective, parallel machine scheduling, precedence constraints, sequence-dependent setup times
منابع مشابه
Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints
This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...
متن کاملMulti-objective Unrelated Parallel Machines Scheduling with Sequence-dependent Setup times and Precedence Constraints
This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...
متن کاملPareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times
This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the mo...
متن کاملA comparison of algorithms for minimizing the sum of earliness and tardiness in hybrid flow-shop scheduling problem with unrelated parallel machines and sequence-dependent setup times
In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...
متن کاملTwo meta-heuristic algorithms for parallel machines scheduling problem with past-sequence-dependent setup times and effects of deterioration and learning
This paper considers identical parallel machines scheduling problem with past-sequence-dependent setup times, deteriorating jobs and learning effects, in which the actual processing time of a job on each machine is given as a function of the processing times of the jobs already processed and its scheduled position on the corresponding machine. In addition, the setup time of a job on each machin...
متن کاملScheduling jobs on parallel machines with sequence-dependent setup times
The study considers the scheduling problem of identical parallel machines subject to minimization of the maximumcompletion time and the maximum tardiness expressed in a linear convex objective function. The maximum completiontime or makespan is the date when the last job to be completed leaves the system. The maximum tardiness is indicated bythe job that is completed with the lo...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
international journal of advanced design and manufacturing technologyجلد ۸، شماره ۴، صفحات ۰-۰
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023