slope stability analysis and assessment for further major failure of angooran open-pit mine
نویسندگان
چکیده
slope stability is one of the major and determiner parameters in the economy and safety of open pit mines. failure and consequently rupture of the slope caused no compensable economic and humanity losses. so, probability assessment of the further failure for presentation of damages and additional costs is of prime importance. in this research, stability analysis and probability assessment of the further failure for angooran lead and zinc mine have been investigated. to investigate its geomechanical properties precisely, main joints and available faults were appraised and some samples of the limestone zone of the mine were prepared for rock mechanics tests to determine these properties. after the accomplishment of these tests, the 3ded code was used to construct a three dimensional model. according to the initial displacements from the software and geomechanical properties of the eastern wall and its concave shape, this wall was supposed to be stable. further analyses were focused on the western wall. for stability analysis of the western wall, the model was constructed based on different cohesions and internal friction angles. it was observed that the magnitudes of displacements were higher than in the eastern wall. so, statistical analysis was performed on the toe of the wall and the probability of the failure calculated to 35.2 percent, according to the obtained displacements.
منابع مشابه
Stability Analysis and Design of Open- Pit Mine Slope in China: A review
Based on current researches and developments of open-pit mine slope in China, the engineering features of open-pit mine slopes are summarized. Mine slope is basically formed by dynamic excavation of multi-level and multi-type, and mining benefit is the purpose of mine slope engineering when using various schemes and/or methods. Thus, the issues of design and stability analyses are the main conc...
متن کاملA genetic algorithm approach for open-pit mine production scheduling
In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...
متن کاملEffects of geometrical and geomechanical properties on slope stability of open-pit mines using 2D and 3D finite difference methods
Slope stability analysis is one of the most important problems in mining and geotechnical engineering. Ignoring the importance of these problems can lead to significant losses. Selecting an appropriate method to analyze the slope stability requires a proper understanding of how different factors influence the outputs of the analyses. This paper evaluates the effects of considering the real geom...
متن کاملInvestigation of Bishop’s and Janbu’s Models Capabilities on Slope Stability Problems with Special Consideration to Open-Pit Mining Operations
One of the most effective parameters in economics of open-pit mines is the pit slope angle, so that the slope angle more than the optimum value increases the probability of a large failure in the pit wall and the slope angle less than the optimum value leads to increasing stripping ratio and reducing net present value of mine. Therefore, in this paper, considering the limit equilibrium methods ...
متن کاملSlope Stability Analysis for Open Pits
In the process of wall design for open pits, a number of steps and levels of analyses are required, from local bench design to overall stability of the walls, to evaluation of the design performance and calibration of parameters through back-analysis. This process requires the use of a variety of methods of analysis and software ranging from limit equilibrium methods to more involved numerical ...
متن کاملdiagnostic and developmental potentials of dynamic assessment for writing skill
این پایان نامه بدنبال بررسی کاربرد ارزیابی مستمر در یک محیط یادگیری زبان دوم از طریق طرح چهار سوال تحقیق زیر بود: (1) درک توانایی های فراگیران زمانیکه که از طریق برآورد عملکرد مستقل آنها امکان پذیر نباشد اما در طول جلسات ارزیابی مستمر مشخص شوند; (2) امکان تقویت توانایی های فراگیران از طریق ارزیابی مستمر; (3) سودمندی ارزیابی مستمر در هدایت آموزش فردی به سمتی که به منطقه ی تقریبی رشد افراد حساس ا...
15 صفحه اولمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
روش های تحلیلی و عددی در مهندسی معدنجلد ۶، شماره ۱۲، صفحات ۳۳-۴۵
کلمات کلیدی
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023