determination for risks in hydrological and water resources projects.

نویسندگان

علی ولی خوجینی

چکیده

statistical analysis is used in hydrology where variables and processes are observed and stated in terms of numbers. the majority of hydrologic phenomena in nature, such as precipitation, runoff, evaporation, sediment transport, water quality properties, elc., are stochastic processes. however, in considering events on an annual basis, the occurence of the events may be assumed independant and the hydrologic system may be assumed to be time invariant. magnitude-frequency relationships are used frequently in water resources design of engineering projects. the empirical simple frequency distributions, as the estimate of the population probability distributions, are often the only available information. the practical plotting position formulas are summarized in this paper. the return period established by frequency analysis such as just described indicates only the average interval between events equal to or greater than a given magnitude, or the probability that such an event will occur in anyone year. if it is desired to select a design flow which is most likely to occur during the life of the structure, it is necessary to use a return period greater than the estimated useful life. often the design return period of a water resources project can be treated as a function of the useful life of the project and the permissible risk of failure. the risk in this subject is identified with probabilities of value greater, or smaller than, a given value. however, there are addi tional risks involved which should be considered in water resources projects, such those due to random measurements and computation, errors of observation, systematic errors in data, non homogenity, loss of information, sampling errors, use of inefficient statistical methods in extracting the information from a pool of data and other errors. the paper shows the development of cumulative frequency curve and its statistical interpretation. the solution techniques of certain problems based

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Hydrological data for surface water resources assessment

The need for hydrological data is discussed in terms of the type of water resources project, and the sampling of information in time and space. The need for consistent data quality is emphasized. Données hydrologiques nécessaires à l'évaluation des ressources en eau de surface Résumé Les besoins en données hydrologiques sont discutés en fonction des divers types de projets de mise en valeur des...

متن کامل

Global hydrological cycles and world water resources.

Water is a naturally circulating resource that is constantly recharged. Therefore, even though the stocks of water in natural and artificial reservoirs are helpful to increase the available water resources for human society, the flow of water should be the main focus in water resources assessments. The climate system puts an upper limit on the circulation rate of available renewable freshwater ...

متن کامل

simulation and experimental studies for prediction mineral scale formation in oil field during mixing of injection and formation water

abstract: mineral scaling in oil and gas production equipment is one of the most important problem that occurs while water injection and it has been recognized to be a major operational problem. the incompatibility between injected and formation waters may result in inorganic scale precipitation in the equipment and reservoir and then reduction of oil production rate and water injection rate. ...

Fuzzy Network Analysis for Projects with High Level of Risks – Uncertainty in Time and Structure

  In order to have better insight of project characteristics, different kinds of fuzzy analysis for project networks have been recently proposed, most of which consider activities duration as the main and only source of imprecision and vagueness, but as it is usually experienced in real projects, the structure of the network is also subject to changes. In this paper we consider three types of i...

متن کامل

application and construction of carbon paste modified electrodes developed for determination of metal ions in some real samples

ساخت الکترودهاِی اصلاح شده ِیکِی از چالشهاِی همِیشگِی در دانش شیمِی بوِیژه شیمِی تجزیه مِی باشد ،که با در نظر گرفتن سادگِی ساخت، کاربردی بودن و ارزان بودن روش مِی توان به باارزش بودن چنِین سنسورهاِی پِی برد.آنچه که در ادامه آورده شده به ساخت و کاربرد الکترودهاِی اصلاح شده با استفاده از نانو ذرات در اندازه گِیرِی ولتامترِی آهن وکادمِیم اشاره دارد. کار اول اختصاص دارد به ساخت الکترود خمِیر کربن اصلاح شده با لِیگاند داِ...

15 صفحه اول

Economic Prioritization of Watershed Management Projects Based on the Impact on Water, Soil and Plant Resources

          In natural resources, economic evaluation is poor in terms of study due to the uncertainty of non-consuming value of resources. In the present study, the evaluation of water, soil and plant resources in watershed management projects and expert questioning was done to enable the projects to be evaluated and prioritized economically. Three sub-watersheds were selected from the Parcel A ...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید


عنوان ژورنال:
نشریه دانشکده فنی

جلد ۳۹، شماره ۱۱، صفحات ۰-۰

کلمات کلیدی

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023