new optimum cycle length equations for pretimed isolated intersections with modification of webster’s equation based on hcm 2000

نویسندگان

علی بابائی زاده

هاشم مهرآذین

چکیده

when the degree of saturation at intersection approaches one, webster’s optimum cycle length equation becomes inapplicable, because the cycle length will becomes very big when the degree of saturation approaches one and will be fully unrealistic when the degree of saturation becomes greater than one. this is not a problem for hcm2000 method. but optimum cycle length calculation in this method has not specific equation and based on try and error to minimize delay time. also this method requires many input parameters that made it expensive. in this paper new modified webster’s optimum cycle length equations for some specific situation of geometric and phasing based on hcm2000 method have been presented that have not described problem. the purpose of this paper is ability to use of “total lost time within the cycle (l)” and “the sum of critical phase flow ratios (y)” parameters and creation new minimum cycle length equation based on hcm2000 method. regarding to this fact that intersection geometry and phasing is related to the optimum cycle length, four situations of intersection have been considered. after this stage the following step by step procedure was used: - having low traffic volume and low “l” - using “hicap2000” software to calculate optimum cycle length - also using webster’s equation to calculate optimum cycle length - increasing traffic volume and repeating the above steps - the above steps continue until degree of saturation at intersection approaches one - increasing “l” and repeating above steps - with renewed increased “l” and repeating above steps we have optimum cycle length for many of “l” and traffic volume at specific intersection after this method we used “spss” software to modeling new relationship between “l” and “y” and finally new equations are presented for four situations of intersection. this method can be expanded for other geometry and phasing intersections.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

fabrication of new ion sensitive field effect transistors (isfet) based on modification of junction-fet for analysis of hydronium, potassium and hydrazinium ions

a novel and ultra low cost isfet electrode and measurement system was designed for isfet application and detection of hydronium, hydrazinium and potassium ions. also, a measuring setup containing appropriate circuits, suitable analyzer (advantech board), de noise reduction elements, cooling system and pc was used for controlling the isfet electrode and various characteristic measurements. the t...

application of upfc based on svpwm for power quality improvement

در سالهای اخیر،اختلالات کیفیت توان مهمترین موضوع می باشد که محققان زیادی را برای پیدا کردن راه حلی برای حل آن علاقه مند ساخته است.امروزه کیفیت توان در سیستم قدرت برای مراکز صنعتی،تجاری وکاربردهای بیمارستانی مسئله مهمی می باشد.مشکل ولتاژمثل شرایط افت ولتاژواضافه جریان ناشی از اتصال کوتاه مدار یا وقوع خطا در سیستم بیشتر مورد توجه می باشد. برای مطالعه افت ولتاژ واضافه جریان،محققان زیادی کار کرده ...

15 صفحه اول

روابط جدید زمان چرخه بهینه برای تقاطع‌های پیش‌زمان‌بندی شده مستقل با تغییر رابطه وبستر براساس روش HCM 2000

When the degree of saturation at intersection approaches one, Webster’s optimum cycle length equation becomes inapplicable, because the cycle length will becomes very big when the degree of saturation approaches one and will be fully unrealistic when the degree of saturation becomes greater than one. This is not a problem for HCM2000 method. But optimum cycle length calculation in this method h...

متن کامل

a new type-ii fuzzy logic based controller for non-linear dynamical systems with application to 3-psp parallel robot

abstract type-ii fuzzy logic has shown its superiority over traditional fuzzy logic when dealing with uncertainty. type-ii fuzzy logic controllers are however newer and more promising approaches that have been recently applied to various fields due to their significant contribution especially when the noise (as an important instance of uncertainty) emerges. during the design of type- i fuz...

15 صفحه اول

A New Optimization Model for Designing Acceptance Sampling Plan Based on Run Length of Conforming Items

The purpose of this article is to present an optimization model for designing an acceptance sampling plan based on cumulative sum of run length of conforming items. The objective is to minimize the total loss including both the producer and consumer losses. The concept of minimum angle method is applied to consider producer and consumer risks in the optimization model. Also the average number o...

متن کامل

Thermodynamic Analysis of New Cogeneration Cycle Based on Gaynarje Hotspring

Gaynarje spring is one of the hottest springs in the world and is located around Meshginshahr in northwestern Iran. Because of the water with a temperature of 82 ºC, it is not appropriate to use this mineral water for swimming and bathing. In this study, in addition to lowering the water temperature to the appropriate swimming temperature (29 ºC), the hot water is used for power and natural gas...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید


عنوان ژورنال:
نشریه دانشکده فنی

جلد ۴۲، شماره ۴، صفحات ۰-۰

کلمات کلیدی
when the degree of saturation at intersection approaches one webster’s optimum cycle length equation becomes inapplicable because the cycle length will becomes very big when the degree of saturation approaches one and will be fully unrealistic when the degree of saturation becomes greater than one. this is not a problem for hcm2000 method. but optimum cycle length calculation in this method has not specific equation and based on try and error to minimize delay time. also this method requires many input parameters that made it expensive. in this paper new modified webster’s optimum cycle length equations for some specific situation of geometric and phasing based on hcm2000 method have been presented that have not described problem. the purpose of this paper is ability to use of “total lost time within the cycle (l)” and “the sum of critical phase flow ratios (y)” parameters and creation new minimum cycle length equation based on hcm2000 method. regarding to this fact that intersection geometry and phasing is related to the optimum cycle length four situations of intersection have been considered. after this stage the following step by step procedure was used: having low traffic volume and low “l” using “hicap2000” software to calculate optimum cycle length also using webster’s equation to calculate optimum cycle length increasing traffic volume and repeating the above steps the above steps continue until degree of saturation at intersection approaches one increasing “l” and repeating above steps with renewed increased “l” and repeating above steps we have optimum cycle length for many of “l” and traffic volume at specific intersection after this method we used “spss” software to modeling new relationship between “l” and “y” and finally new equations are presented for four situations of intersection. this method can be expanded for other geometry and phasing intersections.

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023