a multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
نویسندگان
چکیده
this paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. the net present value (npv) maximization and making span minimization are this study objectives. and since this problem is considered as complex optimization in np-hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms; nsga-ii, mosa and mopso are applied to find the set of pareto solutions for this multi-objective scheduling problem. in order to show performance of the algorithms, different metrics are applied and comparisons between the two algorithms are also considered. the computational results for a set of test problems taken from the project scheduling problem bandar abbas gas condensate refinery project and library are presented and discussed. finally, the computational results illustrate the superior performance of the nsga-ii, mosa and mopso algorithm with regard to the proposed metrics. in order to solve proposed method from nsga-ii algorithm, the results are compared with gams software in some problems. the proposed method is a converge to the optimum and efficient solution algorithm.
منابع مشابه
A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملA Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
متن کاملa multi-mode resource-constrained optimization of time-cost trade-off problems in project scheduling using a genetic algorithm
in this paper, we present a genetic algorithm (ga) for optimization of a multi-mode resource constrained time cost trade off (mrctct) problem. the proposed ga, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. beyond earlier studies on time-cost trade-off problem, in mrctct problem, resource requirements of each execution mo...
متن کاملA multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
متن کاملA Multi-objective optimization model for project scheduling with time-varying resource requirements and capacities
Proper and realistic scheduling is an important factor of success for every project. In reality, project scheduling often involves several objectives that must be realized simultaneously, and faces numerous uncertainties that may undermine the integrity of the devised schedule. Thus, the manner of dealing with such uncertainties is of particular importance for effective planning. A realistic sc...
متن کاملsolution of security constrained unit commitment problem by a new multi-objective optimization method
چکیده-پخش بار بهینه به عنوان یکی از ابزار زیر بنایی برای تحلیل سیستم های قدرت پیچیده ،برای مدت طولانی مورد بررسی قرار گرفته است.پخش بار بهینه توابع هدف یک سیستم قدرت از جمله تابع هزینه سوخت ،آلودگی ،تلفات را بهینه می کند،و هم زمان قیود سیستم قدرت را نیز برآورده می کند.در کلی ترین حالتopf یک مساله بهینه سازی غیر خطی ،غیر محدب،مقیاس بزرگ،و ایستا می باشد که می تواند شامل متغیرهای کنترلی پیوسته و گ...
منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
iranian journal of management studiesناشر: university of tehran, farabi college
ISSN 2008-7055
دوره 8
شماره 4 2015
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023