determination of concession period in build-operate-transfer projects using fuzzy logic
نویسندگان
چکیده
the build-operate-transfer (bot) projects are a popular method of privatization of public infrastructure development. there are several risks which might affect a bot project negatively. concession period is one of the most important decision variables in arranging a bot-type contract which should be determined considering the existing risks and uncertainties. a longer concession period is more beneficial to the private investor, whereas a prolonged concession period may result in loss for government investments. on the other hand, if the concession period were too short, the investor would either reject the contract offer or would be forced to increase the operation fees in order to recover the investment costs and to make a certain level of profit. in this paper, the concession period is determined using a new fuzzy logic based methodology. the proposed approach accounts for the existing risks and uncertainties. in the proposed methodology, the interests of both parties would be ensured and a win-win solution would be achieved. to evaluate the performance of the proposed methodology, the methodology was implemented in a highway project.
منابع مشابه
Determination of Concession Period in Build-Operate-Transfer Projects Using Fuzzy Logic
The build-operate-transfer (BOT) projects are a popular method of privatization of public infrastructure development. There are several risks which might affect a BOT project negatively. Concession period is one of the most important decision variables in arranging a BOT-type contract which should be determined considering the existing risks and uncertainties. A longer concession period is more...
متن کاملA royalty negotiation model for BOT (build-operate-transfer) projects: The operational revenue-based model
Whilst few studies have explored royalty negotiations for build, operate and transfer (BOT) projects, some works have proposed numerous royalty formulas to evaluate royalty amounts or franchise fees for a BOT project. Despite this, the royalty negotiation process is one of the many critical negotiation items of a concession contract. This study not only developed a royalty negotiation model for...
متن کاملRisk assessment for build-operate-transfer projects: a dynamic multi-objective programming approach
This study uses a dynamic multi-objective programming approach to establish a risk assessment model, and develops an iterative algorithm for the model solution. The results obtained show that the sum of the interactive utility value could determine whether or not the interactive relationship is characterized by independence among negotiators. In addition, our numerical example shows that the ri...
متن کاملAnalysis of a Build-Operate-Transfer Scheme for Road Franchising
Private provision of public roads through build-operate-transfer (BOT) contracts is increasing around the world. Under a BOT contract, a private firm would build a road, charge tolls to road users for a period, and then transfer the road to the government. By viewing a BOT contract as a combination of three variables of concession period, road capacity and toll charge, we study optimal BOT cont...
متن کاملBuild Operate Transfer: a Concrete Study of Public Private Partnerships
LIU, YIYI: Build Operate Transfer: A Concrete Study of Public Private Partnerships. (Under the direction of Gary Biglaiser) This dissertation focuses on one of the most used Public-Private Partnership (PPP) contracts: Build-Operate-Transfer (BOT) contract to study the theoretical problems haven’t been well addressed in the contract design. Chapter one focuses on the applicability of a general r...
متن کاملpublic hospital facilities development using build-operate-transfer approach: policy consideration for developing countries
objectives this study is the first of its kind to determine the framework, advantages, and limitations of bot contracts for health care projects in selected countries. background advantages and limitations of build-operate-transfer (bot) contracts in various forms of public-private partnership (ppp) arrangements have not been studied. conclusions this study suggests that more information transp...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
iranian journal of management studiesناشر: university of tehran, farabi college
ISSN 2008-7055
دوره 7
شماره 2 2014
کلمات کلیدی
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023