determination of concession period in build-operate-transfer projects using fuzzy logic

نویسندگان

farnad nasirzadeh

mostafa khanzadi

majid alipour

چکیده

the build-operate-transfer (bot) projects are a popular method of privatization of public infrastructure development. there are several risks which might affect a bot project negatively. concession period is one of the most important decision variables in arranging a bot-type contract which should be determined considering the existing risks and uncertainties. a longer concession period is more beneficial to the private investor, whereas a prolonged concession period may result in loss for government investments. on the other hand, if the concession period were too short, the investor would either reject the contract offer or would be forced to increase the operation fees in order to recover the investment costs and to make a certain level of profit. in this paper, the concession period is determined using a new fuzzy logic based methodology. the proposed approach accounts for the existing risks and uncertainties. in the proposed methodology, the interests of both parties would be ensured and a win-win solution would be achieved. to evaluate the performance of the proposed methodology, the methodology was implemented in a highway project.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Determination of Concession Period in Build-Operate-Transfer Projects Using Fuzzy Logic

The build-operate-transfer (BOT) projects are a popular method of privatization of public infrastructure development. There are several risks which might affect a BOT project negatively. Concession period is one of the most important decision variables in arranging a BOT-type contract which should be determined considering the existing risks and uncertainties. A longer concession period is more...

متن کامل

A royalty negotiation model for BOT (build-operate-transfer) projects: The operational revenue-based model

Whilst few studies have explored royalty negotiations for build, operate and transfer (BOT) projects, some works have proposed numerous royalty formulas to evaluate royalty amounts or franchise fees for a BOT project. Despite this, the royalty negotiation process is one of the many critical negotiation items of a concession contract. This study not only developed a royalty negotiation model for...

متن کامل

Risk assessment for build-operate-transfer projects: a dynamic multi-objective programming approach

This study uses a dynamic multi-objective programming approach to establish a risk assessment model, and develops an iterative algorithm for the model solution. The results obtained show that the sum of the interactive utility value could determine whether or not the interactive relationship is characterized by independence among negotiators. In addition, our numerical example shows that the ri...

متن کامل

Analysis of a Build-Operate-Transfer Scheme for Road Franchising

Private provision of public roads through build-operate-transfer (BOT) contracts is increasing around the world. Under a BOT contract, a private firm would build a road, charge tolls to road users for a period, and then transfer the road to the government. By viewing a BOT contract as a combination of three variables of concession period, road capacity and toll charge, we study optimal BOT cont...

متن کامل

Build Operate Transfer: a Concrete Study of Public Private Partnerships

LIU, YIYI: Build Operate Transfer: A Concrete Study of Public Private Partnerships. (Under the direction of Gary Biglaiser) This dissertation focuses on one of the most used Public-Private Partnership (PPP) contracts: Build-Operate-Transfer (BOT) contract to study the theoretical problems haven’t been well addressed in the contract design. Chapter one focuses on the applicability of a general r...

متن کامل

public hospital facilities development using build-operate-transfer approach: policy consideration for developing countries

objectives this study is the first of its kind to determine the framework, advantages, and limitations of bot contracts for health care projects in selected countries. background advantages and limitations of build-operate-transfer (bot) contracts in various forms of public-private partnership (ppp) arrangements have not been studied. conclusions this study suggests that more information transp...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید


عنوان ژورنال:
iranian journal of management studies

ناشر: university of tehran, farabi college

ISSN 2008-7055

دوره 7

شماره 2 2014

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023