effects of project uncertainties on nonlinear time-cost tradeoff profile
نویسندگان
چکیده
this study presents the effects of project uncertainties on nonlinear time-cost tradeoff (tct) profile of real life engineering projects by the fusion of fuzzy logic and artificial neural network (ann) models with hybrid meta-heuristic (hmh) technique, abridged as fuzzy-ann-hmh. nonlinear time-cost relationship of project activities is dealt with ann models. ann models are then integrated with hmh technique to search for pareto-optimal nonlinear tct profile. hmh technique incorporates simulated annealing in the selection process of multiobjective genetic algorithm. moreover, in real life engineering projects, uncertainties like management experience, labor skills, and weather conditions are commonly involved, which affect the duration and cost of the project activities. fuzzy-ann-hmh analyses responsiveness of nonlinear tct profile with respect to these uncertainties. a comparison of fuzzy-ann-hmh is made with another method in literature to solve nonlinear tct problem and the superiority of fuzzy-ann-hmh is demonstrated by results. the study gives project planners to carry out the best plan that optimizes time and cost to complete a project under uncertain environment.
منابع مشابه
Effects of Project Uncertainties on Nonlinear Time-Cost Tradeoff Profile
This study presents the effects of project uncertainties on nonlinear time-cost tradeoff (TCT) profile of real life engineering projects by the fusion of fuzzy logic and artificial neural network (ANN) models with hybrid meta-heuristic (HMH) technique, abridged as Fuzzy-ANN-HMH. Nonlinear time-cost relationship of project activities is dealt with ANN models. ANN models are then integrated with ...
متن کاملA New Mathematical Approach based on Conic Quadratic Programming for the Stochastic Time-Cost Tradeoff Problem in Project Management
In this paper, we consider a stochastic Time-Cost Tradeoff Problem (TCTP) in PERT networks for project management, in which all activities are subjected to a linear cost function and assumed to be exponentially distributed. The aim of this problem is to maximize the project completion probability with a pre-known deadline to a predefined probability such that the required additional cost is min...
متن کاملMulti-objective optimization of discrete time–cost tradeoff problem in project networks using non-dominated sorting genetic algorithm
The time–cost tradeoff problem is one of the most important and applicable problems in project scheduling area. There are many factors that force the mangers to crash the time. This factor could be early utilization, early commissioning and operation, improving the project cash flow, avoiding unfavorable weather conditions, compensating the delays, and so on. Since there is a need to allocate e...
متن کاملA Fuzzy Simulated Annealing approach for project time-cost tradeoff
Managers often face difficulties when making project decisions that involve large number of interrelated activities – the planning and scheduling of which is project management. Most problems often arise in areas such as product development, production planning and control and setting up the production facilities. One important aspect of project management is activity crashing, i.e. reducing th...
متن کاملthe effects of time planning and task complexity on accuracy of narrative task performance
هدف اصلی این تحقیق بررسی تاثیر برنامه ریزی زمانی، هم چنین افزایش میزان پیچیدگی تکالیف در نظر گرفته شده بصورت همزمان، بر دقت و صحت و پیچیدگی عملکرد نوشتاری زبان آموزان می باشد. بدین منظور، 50 نفر از دانش آموزان دختر در رده ی سنی 16 الی 18 سال به عنوان شرکت کنندگان در این زمینه ی تحقیق در نظر گرفته شدند و به دو گروه آزمایشی و کنترل بصورت اتفاقی تقسیم شدند. اعضای گروه آزمایشی هر دو تکلیف ساده و پی...
An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation
The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resourc...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
iranian journal of fuzzy systemsناشر: university of sistan and baluchestan
ISSN 1735-0654
دوره 12
شماره 4 2015
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023