rehabilitation ofabandoned open excavation forbeneficial use of the pit lake at nyala magnesite mine
نویسندگان
چکیده
abandoned surface mine excavations can be a major environmental, social and/or human healthproblem for the mining industry as well as for the community living nearby. this problem is exacerbated by therapidly growing population encroaching on areas of historic mined lands. the aim of this studywas to assess thesafety status of the historic nyala mine excavation with the purpose of coming up with rehabilitation options thatpromote the beneficial use of the pit lake. the study involved characterisation of the abandoned excavationthrough field description,modelling of both the geometry of the pit and the flow of surface runoff in to the pit, andchemical analysis of the pit lake water. a survey of the pit landscape showed pit walls of up to 22m high with aslope angle ranging from 10° to 30°. the pit was found to be accumulating runoff water from high grounds alongthe northern part of the excavation. pit water was found to be alkaline (ph ±9.6), with f- (±1.1 ppm), cl-(±169.6 ppm),mg2+ (±67.85 ppm) andk+ (±87.16 ppm) concentrations that were all above the standards permissible for domestic use. this study demonstrated that beside backfilling of oldmines excavations; rehabilitation techniques that transform lifeless landscapes into prosperous ones, with beneficial end uses can be considered.
منابع مشابه
Analysis of the Potential for Use of Floating Photovoltaic Systems on Mine Pit Lakes: Case Study at the Ssangyong Open-Pit Limestone Mine in Korea
Recently, the mining industry has introduced renewable energy technologies to resolve power supply problems at mines operating in polar regions or other remote areas, and to foster substitute industries, able to benefit from abandoned sites of exhausted mines. However, little attention has been paid to the potential placement of floating photovoltaic (PV) systems operated on mine pit lakes beca...
متن کاملA genetic algorithm approach for open-pit mine production scheduling
In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...
متن کاملAnalyzing the effect of ore grade uncertainty in open pit mine planning; A case study of Rezvan iron mine, Iran
Due to uncertain nature of grade in ore deposits, considering uncertainty is inevitable in geological modelling of resources and mine planning. In other words, uncertainty in grade of mineralized materials, is one of the most significant parameters need attention in mine planning. In this paper, a comparative procedure utilizing Sequential Gaussian Simulation (SGS) and traditional Ordinary Krig...
متن کاملA new algorithm for the open-pit mine scheduling problem
For the purpose of production scheduling, open pit mines are discretized into threedimensional arrays known as block models. Production scheduling consists in deciding which blocks should be extracted, when they should be extracted and how each extracted block should be processed. Blocks which are on top should be extracted first, and capacity constraints limit the production each time period. ...
متن کاملNumerical modelling of the groundwater inflow to an advancing open pit mine: Kolahdarvazeh pit, Central Iran.
The groundwater inflow into a mine during its life and after ceasing operations is one of the most important concerns of the mining industry. This paper presents a hydrogeological assessment of the Irankuh Zn-Pb mine at 20 km south of Esfahan and 1 km northeast of Abnil in west-Central Iran. During mine excavation, the upper impervious bed of a confined aquifer was broken and water at high-pres...
متن کاملA New Cost Model for Estimation of Open Pit Copper Mine Capital Expenditure
One of the most important issues in all stages of mining study is capital cost estimation. Determination of capital expenditure is a challenging issue for mine designers. In recent decade, quite a few number of studies have focused on proposing estimation models to predict mining capital cost. However, these efforts have not achieved to a predictor model with reliable range of error. Both of ov...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
international journal of environmental researchناشر: university of tehran
ISSN 1735-6865
دوره 9
شماره 1 2015
کلمات کلیدی
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023