proposed a genetic algorithm for inventory planning model in project supply chain

نویسندگان

ابراهیم تیموری

iran university of science and technology فاطمه السادات موسوی

iran university of science and technology

چکیده

on time supply of materials in construction projects is very important. therefore, coordinating a project with key suppliers, while ensuring the timely supply of materials, make the minimum costs of project. one way to create this coordination is integrated inventory planning which has been accomplished in this study. it is necessary to mention that such a model is considered np_hard in terms of complexity class, because the model is compound of the inventory planning and planning with limited resources, that in literature, the class of programs with limited resources is considered np_hard. therefore, in this paper while introducing the inventory planning model in project supply chain, a model based on genetic algorithm is proposed to determine the solution. the proposed algorithm has been run for the suitable size problem and the results show that the introduced algorithm, in actual sizes, within a reasonable time, provides an appropriate response.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

an inventory–scheduling model for supply chain of construction project

one of the important problems in project management is lack of available resources in proper time at project site that leads to lack of project implementation in due date. this problem may be lead to time delay in sending resources from suppliers and related origins in supply chain to project site. therfore, to better resources managmenet and also the improvement of supply chain condition, the ...

متن کامل

A Genetic Algorithm Developed for a Supply Chain Scheduling Problem

This paper concentrates on the minimization of total tardiness and earliness of orders in an integrated production and transportation scheduling problem in a two-stage supply chain. Moreover, several constraints are also considered, including time windows due dates, and suppliers and vehicles availability times. After presenting the mathematical model of the problem, a developed version of GA c...

متن کامل

Optimizing Inventory Using Genetic Algorithm for Efficient Supply Chain Management

Problem statement: Today, inventory management is considered to be an important field in Supply chain management. Once the efficient and effective management of inventory is carried out throughout the supply chain, service provided to the customer ultimately gets enhanced. Hence, to ensure minimal cost for the supply chain, the determination of the level of inventory to be held at various level...

متن کامل

Adaptive genetic algorithm for advanced planning in manufacturing supply chain

A main function for supporting global objectives in a manufacturing supply chain is planning and scheduling. This is considered such an important function because it is involved in the assignment of factory resources to production tasks. In this paper, an advanced planning model that simultaneously decides process plans and schedules was proposed for the manufacturing supply chain (MSC). The mo...

متن کامل

A general model for production-transportation planning in steel supply chain

This paper is focused on the tactical design of steel supply chain (SSC). A general mathematical model is proposed to integrate production and transportation planning in multi-commodity SSC. The main purpose is to prepare a countrywide production and distribution plan in an SSC with three layers consisting of iron ore mines as suppliers, steel companies as producers, and subsidiary steel compan...

متن کامل

Project-Driven Supply Chains: Integrating Inventory Planning with Project Management ∗

We consider the strategic planning of recurrent projects and their material supplies over an extended period of time. We propose a mathematic modeling framework – the project-driven supply chain (PDSC) – to integrate project management (resource planning and scheduling within each project) with material supply management (lead-time planning based on multiproject statistics). For tree structure ...

متن کامل

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023