airside of airport capacity enhancement based on flexible flow shop multi-objective scheduling model

نویسندگان

علی عبدی

دکترای مهندسی عمران، دانشکده فنی¬ و مهندسی، دانشگاه تربیت مدرس ابراهیم اسدی

دانشجوی دکترای مهندسی صنایع، دانشکده فنی¬ و مهندسی، دانشگاه تربیت مدرس محمود صفارزاده

استاد مهندسی عمران، دانشکده فنی¬ و مهندسی ، دانشگاه تربیت مدرس فریبرز جولای

استاد مهندسی صنایع، پردیس دانشکده فنی، دانشگاه تهران نسیم نهاوندی

چکیده

this research, for the first time presents the flexible flow shop model of scheduling method for considering runway assignment and operations planning together. one of the advantages of the developed model is considering the procedures of air routes in terminal airspace and separation between consecutive aircraft which is very similar to the real world condition. there are different objective functions in airport literature, then a dual criteria model offers for this problem and solve with meta-heuristics sa (simulated annealing) algorithm. this approach can be used as a decision aiding tool, delay reduction, and improving the available runway throughput.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving Flexible Job Shop Scheduling with Multi Objective Approach

  In this paper flexible job-shop scheduling problem (FJSP) is studied in the case of optimizing different contradictory objectives consisting of: (1) minimizing makespan, (2) minimizing total workload, and (3) minimizing workload of the most loaded machine. As the problem belongs to the class of NP-Hard problems, a new hybrid genetic algorithm is proposed to obtain a large set of Pareto-optima...

متن کامل

Scheduling on flexible flow shop with cost-related objective function considering outsourcing options

This study considers outsourcing decisions in a flexible flow shop scheduling problem, in which each job can be processed by either an in-house production line or outsourced. The selected objective function aims to minimize the weighted sum of tardiness costs, in-house production costs, and outsourcing costs with respect to the jobs due date. The purpose of the problem is to select the jobs tha...

متن کامل

Batch Scheduling in Flexible Flow Shop

In this paper, the problem of batch scheduling in a flexible flow shop environment is studied. It is assumed that machines in some stages are able to process a number of jobs simultaneously. The applications of this problem can be found in various industries including spring and wire manufacturing and in auto industry. A mixed integer programming formulation of the problem is presented and it i...

متن کامل

Batch Scheduling in Flexible Flow Shop

In this paper, the problem of batch scheduling in a flexible flow shop environment is studied. It is assumed that machines in some stages are able to process a number of jobs simultaneously. The applications of this problem can be found in various industries including spring and wire manufacturing and in auto industry. A mixed integer programming formulation of the problem is presented and it i...

متن کامل

Multi-objective Scheduling Simulation of Flexible Job-shop Based on Multi-population Genetic Algorithm

In view of the difficulty of obtaining the optimal solution to the multi-objective scheduling of flexible job-shop by the general genetic algorithm, this paper takes into account the shortest processing time and the balanced use of machines, and puts forward the multi-population genetic algorithm based on the multi-objective scheduling of flexible job-shop. The method attempts to minimize the l...

متن کامل

Multi-Objective Flexible Job Shop Scheduling Optimization Models (II)

For the Multi-Objective Flexible Job Shop Scheduling Problems (MOFJSSP), various optimization models have been designed. In the first part of the research (published in no. 2/2012) we presented the multi-sort production systems, the theoretical aspects of MOFJSSP framework, a specific real JSS process in drugs industry based on over 600 tasks to be optimally scheduled (used as a case study for ...

متن کامل

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023