repair scheduling of returned products with spare parts lot sizing and scheduling in two level reverse logistics

نویسندگان

سید حسام¬الدین ذگردی

دانشیار بخش مهندسی صنایع- دانشگاه تربیت مدرس محسن صادق عمل¬نیک

دانشیار دانشکده مهندسی صنایع و سیستم ها-پردیس دانشکده های فنی-دانشگاه تهران محمد یاوری

دانشجوی دکترای مهندسی صنایع- دانشگاه تربیت مدرس

چکیده

in this paper a new problem of three stage disassembly-assembly scheduling is introduced and reviewed. this problem, which was arisen from the aviation industry characteristics, is a generalization of the two stage assembly scheduling problem. products (helicopters) in the aviation industry return to assembler for annual overhaul repair services. in the first stage helicopters are disassembled into their components. after that, the components are sent to their dedicated machines in the second stage for repair operations concurrently. in the second stage, some of the components may require one or more spare parts. repair operations of the components can be started when their required spare parts are available at that time. after completing all of the component operations, the assemble stage can be started. in this problem we consider repair scheduling of components and lot sizing and scheduling of their required spare parts with the objective of minimizing sum of total completion times of the retuned products and spare parts inventory costs. in this study, an integrated formulation approach has been employed for the problem and a linear mip was developed. a base case from aviation industry was solved and results were analyzed. the sensitivity analysis of the problem was carried out by changing key parameters of the base case. selecting a repair strategy or changing to a new strategy is a key decision in the aviation industry. in this study, changing to a new strategy has been compared with three existing repair strategies in 120 problem instances using three types of data sets. results showed that various strategies could be selected depend on the quality of returned products. the repairing shared items strategy has a better performance in average compared to the other strategies.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Simultaneous Lot Sizing and Scheduling in a Flexible Flow Line

This paper breaks new ground by modelling lot sizing and scheduling in a flexible flow line (FFL) simultaneously instead of separately. This problem, called the ‘General Lot sizing and Scheduling Problem in a Flexible Flow Line’ (GLSP-FFL), optimizes the lot sizing and scheduling of multiple products at multiple stages, each stage having multiple machines in parallel. The objective is to satisf...

متن کامل

Economic Lot Sizing and Scheduling in Distributed Permutation Flow Shops

This paper addresses a new mixed integer nonlinear and linear mathematical programming economic lot sizing and scheduling problem in distributed permutation flow shop problem with number of identical factories and machines. Different products must be distributed between the factories and then assignment of products to factories and sequencing of the products assigned to each factory has to be d...

متن کامل

Scheduling with Batching and Lot-sizing

Jobs can be batched if they share the same setup times on a machine in many practical situations. Another reason for batching arises when a machine can process several jobs at the same time. On the other hand, splitting a job or lot which consists of many identical items often increases customer service and decreases throughput time. Especially in CIM (Computer Integrated Manufacturing) these d...

متن کامل

Fuzzy job shop scheduling with lot-sizing

This paper deals with a problem of determining lot-sizes of jobs in a real-world job shop-scheduling in the presence of uncertainty. The main issue discussed in this paper is lot-sizing of jobs. A fuzzy rule-based system is developed which determines the size of lots using the following premise variables: size of the job, the static slack of the job, workload on the shop floor, and the priority...

متن کامل

A Stochastic Lot-Sizing and Scheduling Model

Companies are trying to improve their ability to deliver and to reduce their production costs simultaneously. Nevertheless ongoing orders of customers are causing difficulties to deliver because of bottlenecks in the production. Furthermore constantly incoming customer orders effect that every actual optimal production plan with its already realized and planned guidelines has induced states tha...

متن کامل

robust simultaneous lot-sizing & scheduling model with uncertain demand

optimization models have been used to support decision making in production planning for a long time. however, several of those models are deterministic and do not address the variability that is present in some of the data. robust optimization is a methodology which can deal with the uncertainty or variability in optimization problems by computing a solution which is feasible for all possible ...

متن کامل

منابع من

با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید


عنوان ژورنال:
مهندسی صنایع

جلد ۴۶، شماره ۲، صفحات ۲۰۵-۲۱۸

کلمات کلیدی

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023