project risk assessment model using multi-objective decision-making approach (case study: the earth dam project asalooye)

نویسندگان

ام البنین یوسفی

دانشجوی دکترای دانشگاه علم و صنعت- عضو هیأت علمی دانشگاه صنعتی مالک اشتر پوریا ناصری

دانشجوی کارشناسی ارشد- دانشگاه صنعتی مالک اشتر سید اکبر نیلی پور طباطبایی

استادیار- عضو هیأت علمی دانشگاه صنعتی مالک اشتر

چکیده

risk management is one of the nine project management processes, which provides positive results and minimizes the probability and consequences of adverse effects in the project.  in this article a zero-one linear programming model with multiple objectives is used to characterize the potential risks. the proposed model has two main objectives. the first objective is the minimization of the expected cost of different risks and the second one is to minimize expected time resulting from potential risks. the model has also two limitations, the first ensures that time effect of occurred risks, does not excess the total effect of the time value of expected risk and the second one controls the cost of occurred risk to be less than or equal to the expected cost values. the lp metric method is proposed to solve the model and obtain the pareto optimal solutions for a case study in a dam in asalouyeh.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Multi-Criteria Decision-Making Approach with Interval Numbers for Evaluating Project Risk Responses

The risk response development is one of the main phases in the project risk management that has major impacts on a large-scale project’s success. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. Conventional approaches tend to be less effective in dealing with the imprecise of the risk response deve...

متن کامل

A New Multi-objective Model for Multi-mode Project Planning with Risk

The purpose of this problem is to choose a set of project activities for crashing, in a way that the expected project time, cost and risk are minimized and the expected quality is maximized. In this problem, each project activity can be performed with a specific executive mode. Each executive mode is characterized with four measures, namely the expected time, cost, quality and risk. In this pap...

متن کامل

A MULTI-OBJECTIVE OPTIMIZATION MODEL FOR PROJECT PORTFOLIO SELECTION CONSIDERING AGGREGATE COMPLEXITY: A CASE STUDY

Existing project selection models do not consider the complexity of projects as a selection criterion, while their complexity may prolong the project duration and even result in its failure. In addition, existing models cannot formulate the aggregate complexity of the selected projects. The aggregated complexity is not always equal to summation of complexity of projects because of possible syne...

متن کامل

Project Risk Assessment Framework

This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...

متن کامل

A fuzzy group decision making approach to construction project risk management

Implementation of the risk management concepts into construction practice may enhance the performance of project by taking appropriate response actions against identified risks. This research proposes a multi-criteria group decision making approach for the evaluation of different alternative response scenarios. To take into account the uncertainties inherent in evaluation process, fuzzy logic i...

متن کامل

Determining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)

Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...

متن کامل

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023