joint scheduling and available-to-promise calculation in make-to-forecast production systems

نویسندگان

مسعود ربانی

دانشکده مهندسی صنایع- پردیس دانشکده های فنی- دانشگاه تهران فاطمه منشی

مهندسی صنایع- پردیس دانشکده های فنی- دانشگاه تهران حامد رفیعی

مهندسی صنایع- پردیس دانشکده های فنی- دانشگاه تهران

چکیده

making a rational decision about the free production capacity of a firm requires accurate and comprehensive information in different fields such as unscheduled time of the machines, materials or other required resources status in the firm and the related supply chain. in this study, we try to achieve the needed information through integrating advanced available-to-promise mechanism with scheduling in flow shop production systems. the aim is to determine the scheduling of the orders simultaneously with calculating the free capacity of the system to determine the atp. therefore, some different kinds of constraints including the availability of the machines and materials are considered. the obtained results from solving the proposed model lead to proper values for performance indexes.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Multi-site production planning in hybrid make-to-stock/make-to-order production environment

Today competitive environment has enforced practitioners and researchers to pay great attention to issues enhancing both production and marketing competitiveness. To do so, it has been obligatory for the firms to consider production side activities while customer requirements are on the other side of competition. In this regard, hybrid make-to-stock (MTS)/make-to-order (MTO) production systems ...

متن کامل

A Simulation-Optimization Model For Capacity Coordination In Make To Stock/Make To Order Production Environments

Capacity coordination, as the tactical level of hierarchical production planning in hybrid MTS/MTO systems, includes numerous important decisions. In this paper, two of these decisions i.e. finding the best strategy for the acceptance/rejection of incoming orders and determining orders’ due dates – are investigated. Also a simulation model is proposed to evaluate the efficiency of the presented...

متن کامل

Mixed Model Assembly Line Sequencing In Make to Order System with Available to Promise Consideration

Mixed model assembly lines (MMAL) are a type of production line where a variety of product models similar in product characteristics are assembled. The effective design of these lines requires that schedule for assembling the different products is determined. In this paper we tried to fit the sequencing problem with the main characteristics of make to order (MTO) environment. The problem solved...

متن کامل

Integrated model for pricing, delivery time setting, and scheduling in make-to-order environments

Usually, in make-to-order environments which work only in response to the customer’s orders, manufacturers for maximizing the profits should offer the best price and delivery time for an order considering the existing capacity and the customer’s sensitivity to both the factors. In this paper, an integrated approach for pricing, delivery time setting and scheduling of new arrival orders are prop...

متن کامل

Managing an Available-to-Promise Assembly System with Dynamic Short-Term Pseudo-Order Forecast

W study an order promising problem in a multiclass, available-to-promise (ATP) assembly system in the presence of pseudo orders. A pseudo order refers to a tentative customer order whose attributes, such as the likelihood of an actual order, order quantity, and confirmation timing, can change dynamically over time. A unit demand from any class is assembled from one manufactured unit and one inv...

متن کامل

efl teachers job satisfaction and social capital in relation to students’ motivation

abstract this mixed method study examines whether there is any relationship among the variables of the study (job satisfaction, social capital and motivation). the researcher considered job satisfaction and social capital as independent variables; motivation is the dependent variable of the study. the researcher applied a questionnaire to assess each variable. to measure efl teachers’ job sati...

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023