a model to solve project scheduling and staff assignment problems
نویسندگان
چکیده
the allocation of human resources to project activities in order to schedule them is one of the closest states to the actual conditions of scheduling problems. but regarding the fact that this problem belongs to the class of np-hard problems; so far the exact methods have only been able to solve the small size problems. in this study, the renewable resources are humans in a way that every staff with multiple skills is only able to satisfy one of activities’ skill requirements at a specific time. in this paper, defining the efficiency degrees for the staff, a mathematical programming model is presented for simultaneous solving of the two problems. since this problem belongs to np-hard problems, a meta-heuristic differential evolution algorithm is developed for solving real-world cases. the results prove the efficiency of the algorithm in simultaneous solving of project scheduling and human resources allocation problems.
منابع مشابه
Competence-driven project portfolio selection, scheduling and staff assignment
This paper presents a new model for project portfolio selection, paying specific attention to competence development. The model seeks to maximize a weighted average of economic gains from projects and strategic gains from the increment of desirable competencies. As a sub-problem, scheduling and staff assignment for a candidate set of selected projects must also be optimized. We provide a nonlin...
متن کاملIntegrated Project Scheduling and Staff Assignment with Controllable Processing Times
This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and...
متن کاملA MODEL AND GENETIC ALGORITHM TO SOLVE COMPLEX PS (Project Scheduling) PROBLEMS
This paper solves a complex PS problem by employing a reproduction mechanism which is closer to natural than the common GA methods. The PS problem consists of: operations sequence constraints, alternative modes per operation, multi renewable resources, resource setups, and other properties. The resulting model is very complex; hence, common GA methods produce unfeasible solutions very frequentl...
متن کاملA Neural Network Model to Solve DEA Problems
The paper deals with Data Envelopment Analysis (DEA) and Artificial Neural Network (ANN). We believe that solving for the DEA efficiency measure, simultaneously with neural network model, provides a promising rich approach to optimal solution. In this paper, a new neural network model is used to estimate the inefficiency of DMUs in large datasets.
متن کاملA stochastic model for project selection and scheduling problem
Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...
متن کاملA Honey Bee Algorithm To Solve Quadratic Assignment Problem
Assigning facilities to locations is one of the important problems, which significantly is influence in transportation cost reduction. In this study, we solve quadratic assignment problem (QAP), using a meta-heuristic algorithm with deterministic tasks and equality in facilities and location number. It should be noted that any facility must be assign to only one location. In this paper, first o...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
مهندسی صنایعجلد ۴۸، شماره Special Issue، صفحات ۴۵-۵۴
کلمات کلیدی
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023