a two-objective robust optimization model for project risks response selection and explanation solution method
نویسندگان
چکیده
risk management is one of the most important aspects of project management that identifies, assesses and responds to project risks. although many papers have been published in project risk response, presented tools and methods are poor. hence, in this paper, we present an optimization model to respond project risk that seeks to optimize two key criteria of project: cost and time. the proposed model has two objectives that one of them is minimization of the total cost that include abatement action cost and the cost of risk loss on project, and the other one is minimization of the time loss of risk (i.e., maximization robust measure) according to a free float activity’s measure. the model tries to choose abatement actions of risk that loss of them on time activity is greater than free float activity. subsequently, three solution methods (i.e., exact, heuristic and meta-heuristic) are proposed. then we create ten sample projects in three categories (i.e., small, medium and large scale) and solve the problems with the proposed methods and compare the results.
منابع مشابه
solution of security constrained unit commitment problem by a new multi-objective optimization method
چکیده-پخش بار بهینه به عنوان یکی از ابزار زیر بنایی برای تحلیل سیستم های قدرت پیچیده ،برای مدت طولانی مورد بررسی قرار گرفته است.پخش بار بهینه توابع هدف یک سیستم قدرت از جمله تابع هزینه سوخت ،آلودگی ،تلفات را بهینه می کند،و هم زمان قیود سیستم قدرت را نیز برآورده می کند.در کلی ترین حالتopf یک مساله بهینه سازی غیر خطی ،غیر محدب،مقیاس بزرگ،و ایستا می باشد که می تواند شامل متغیرهای کنترلی پیوسته و گ...
A MULTI-OBJECTIVE OPTIMIZATION MODEL FOR PROJECT PORTFOLIO SELECTION CONSIDERING AGGREGATE COMPLEXITY: A CASE STUDY
Existing project selection models do not consider the complexity of projects as a selection criterion, while their complexity may prolong the project duration and even result in its failure. In addition, existing models cannot formulate the aggregate complexity of the selected projects. The aggregated complexity is not always equal to summation of complexity of projects because of possible syne...
متن کاملA Robust Programming Approach to Bi-objective Optimization Model in the Disaster Relief Logistics Response Phase
Accidents and natural disasters and crises coming out of them indicate the importance of an integrated planning to reduce their effected. Therefore, disaster relief logistics is one of the main activities in disaster management. In this paper, we study the response phase of the disaster management cycle and a bi-objective model has been developed for relief chain logistic in uncertainty conditi...
متن کاملA Multi-objective optimization model for project scheduling with time-varying resource requirements and capacities
Proper and realistic scheduling is an important factor of success for every project. In reality, project scheduling often involves several objectives that must be realized simultaneously, and faces numerous uncertainties that may undermine the integrity of the devised schedule. Thus, the manner of dealing with such uncertainties is of particular importance for effective planning. A realistic sc...
متن کاملA Robust Optimization Methodology for Multi-objective Location-transportation Problem in Disaster Response Phase under Uncertainty
This paper presents a multi-objective model for location-transportation problem under uncertainty that has been developed to respond to crisis. In the proposed model, humanitarian aid distribution centers (HADC), the number and location of them, the amount of relief goods stored in distribution centers, the amount of relief goods sent to the disaster zone, the number of injured people transferr...
متن کاملA stochastic model for project selection and scheduling problem
Resource limitation in zero time may cause to some profitable projects not to be selected in project selection problem, thus simultaneous project portfolio selection and scheduling problem has received significant attention. In this study, budget, investment costs and earnings are considered to be stochastic. The objectives are maximizing net present values of selected projects and minimizing v...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
مهندسی صنایعجلد ۵۰، شماره ۱، صفحات ۳۷-۵۱
کلمات کلیدی
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023