assessment of watershed management activities on time of concentration and curve number using hec-hms model (case study: kan watershed, tehran)
نویسندگان
چکیده
assessment of watershed management activities is one of the main subjects for future planning of practical projects and natural resources management. due to the lack of any tool for assessment of watershed processes in many cases, distributed hydrological models can be useful. the purpose of this study was evaluation of watershed management activities in kan watershed by hec-hms (hydrologic modeling system). for this purpose, first by considering observed events, hec-hms model was optimized and calibrated. then, for evaluating the effects of check dams on time of concentration, it was calculated before and after of check dam's construction by use of field observations and vegetation cover improvement was also estimated after the project. these parameters were imported to hec-hms to find out the effects of watershed practices and then flooding condition was simulated. for assessment purposes, peak discharge and flood volume were calculated for “before” and “after” construction conditions. results showed that check dams as mechanical measures had low effect on time of concentration while biological practices lead to decrease in curve number with an average value of 3.1. this effects result in decrease of peak flow and flood volume meanly 21% and 11%, respectively.
منابع مشابه
Impact of Watershed Management activities on flood hydrograph Using HEC-HMS Model (Case Study: Ramyan Watershed)
Increasing the use of water and soil resources in watershed in recent years and unproductive and inappropriate use of land ecology has exacerbated the occurrence of floods. In this context, watershed management is one of the most effective ways to cope with this crisis. This research quantify the results of these activities by calculating the decreased volume and discharge due to biomechanical ...
متن کاملeffects of land use changes on flood characteristics using hec-hms model (case study: taleghan watershed)
land use change is one of the main factors in the process of changing the regime of flood in watersheds. taleghan watershed has been subjected to many land use changes over years, which probably effects on flood characteristics of taleghan river. in present study the effects of land use change on some parameters including peak flow, volume and flood base time, in part of taleghan basin, was inv...
متن کاملSimulation of Rainfall-Runoff Process Using Green-Ampt Method and HEC-HMS Model (Case Study: Abnama Watershed, Iran)
Estimation of surface runoff in a watershed based on the rate of received precipitation and quantifying discharge at outlet is important in hydrologic studies. In this study, HEC-HMS hydrological model version 3.4 was used to simulate rainfall-runoff process in Abnama watershed located in south of Iran. To compute infiltration, rainfall excess conversion to runoff and flow routing, methods like...
متن کاملthe effect of traffic density on the accident externality from driving the case study of tehran
در این پژوهش به بررسی اثر افزایش ترافیک بر روی تعداد تصادفات پرداخته شده است. به این منظور 30 تقاطع در شهر تهران بطور تصادفی انتخاب گردید و تعداد تصادفات ماهیانه در این تقاطعات در طول سالهای 89-90 از سازمان کنترل ترافیک شهر تهران استخراج گردید و با استفاده از مدل داده های تابلویی و نرم افزار eviews مدل خطی و درجه دوم تخمین زده شد و در نهایت این نتیجه حاصل شد که تقاطعات پر ترافیک تر تعداد تصادفا...
15 صفحه اولAssessment of Watershed Management Activities using Analytical Hierarchy Process and Analytical Network Process (Case study: Heidary Watershed, Chaharmahal and Bakhtiari Province)
In this research, in order to assess the biological and mechanical measures of flood and erosion control, two sub-watersheds of Heidari Watershed located in Chaharmahal and Bakhtiari Province with similar climatic, hydrological, edaphic, vegetation and land use conditions as representative areas were selected. To assess the conducted measures, social criteria including education, participation,...
متن کاملEvaluating the Impact of Watershed Management Activities on Upstream Urban Areas (Case study: Tehran 5th and 22nd District Upper Watersheds)
One of the problems of some cities in the country, especially those in the vicinity of mountainous watersheds, is the containment and control of runoff, erosion and sedimentation that results in many damages to downstream facilities and infrastructure each year. Watershed operations have been proposed for years to reduce and mitigate destructive effects, and some measures have been taken ...
متن کاملمنابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
مرتع و آبخیزداریجلد ۶۳، شماره ۳، صفحات ۳۷۵-۳۸۵
کلمات کلیدی
میزبانی شده توسط پلتفرم ابری doprax.com
copyright © 2015-2023