a new mathematical model for solving multi-product assembly line balancing problems

نویسندگان

mohammad taghi taghavi fard

استادیار دانشکده مدیریت و حسابداری دانشگاه علامه طباطبایی، تهران، ایران

چکیده

the basic type of assembly line balancing (alb) problem is the allocation of work elements to a set of production work stations considering cycle time, precedence constraints, and assembly diagram to achieve predefined performance criteria such as line efficiency and smoothness index. in this paper, a mixed integer programming model for solving multiple product alb problems with processing times larger than cycle time as well as technological constraints is presented. the performance of presented model in finding optimal solution is compared with models presented in the literature by solving sample problems. the obtained results were quite satisfactory. also, the relative advantages of the proposed model in comparison with some approaches in the literature are verified and shown using kruskal-wallis non-parametric testing approach. this was accomplished by calculating the measures of performance such as line smoothness, line efficiency and deviations of solved sample problems.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving a multi-objective mixed-model assembly line balancing and sequencing problem

This research addresses the mixed-model assembly line (MMAL) by considering various constraints. In MMALs, several types of products which their similarity is so high are made on an assembly line. As a consequence, it is possible to assemble and make several types of products simultaneously without spending any additional time. The proposed multi-objective model considers the balancing and sequ...

متن کامل

A Multi-Objective Particle Swarm Optimization for Mixed-Model Assembly Line Balancing with Different Skilled Workers

This paper presents a multi-objective Particle Swarm Optimization (PSO) algorithm for worker assignment and mixed-model assembly line balancing problem when task times depend on the worker’s skill level. The objectives of this model are minimization of the number of stations (equivalent to the maximization of the weighted line efficiency), minimization of the weighted smoothness index and minim...

متن کامل

A cost-oriented model for multi-manned assembly line balancing problem

In many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. This type of assembly line is called multi-manned assembly line (MAL). In the classical multi-manned assembly line balancing problem (MALBP) the objective is to minimize the manpower needed to manufacture one product unit. Apart from the manpower, othe...

متن کامل

A New Mathematical Model for a Multi-product Supply Chain Network with a Preventive Maintenance Policy

The supply chain network design (SCND) implicates decision-making at a strategic level and makes it possible to create an effective and helpful context for managing. The aim of the network is to minimize the total cost so that customer's demands should be met. Preventive maintenance is pre-determined work performed to a schedule with the aim of preventing the wear and tear or sudden failure of ...

متن کامل

a cost-oriented model for multi-manned assembly line balancing problem

in many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. this type of assembly line is called multi-manned assembly line (mal). in the classical multi-manned assembly line balancing problem (malbp) the objective is to minimize the manpower needed to manufacture one product unit. apart from the manpower, othe...

متن کامل

Fuzzy multi-objective assembly line balancing problem: Fuzzy mathematical programming approach

Design of assembly line is done in order to more coordinate a collection of some consecutive work stations for the aim of obtaining more productivity from the work stations and workers. The stations are arranged in a way to have a continuous and constant material flow. In this paper a multi-objective formulation for assembly line balancing is introduced. As a solution approach a two-step approa...

متن کامل

میزبانی شده توسط پلتفرم ابری doprax.com

copyright © 2015-2023